Laserfiche WebLink
4 <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />48 exQloration drill holes all located on existing _roads_. Each drill <br />padsill be no larger than,._2,0_'x20' (400 sa.ft_Minor refurbishment._ <br />of existing„roads such as drainage crossings and random boulder removal. <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if neeessan°: <br />A. Drill Pads: Quantity 4 8 __ Average Width 2 0 (ft) Average Length 2 0 (ft) <br />B. Drill Holes: Quantity 48 -Depth 350-500 (ft) Diameter 6 1/ 4 (in) <br />C. Mud Pits: Quantity 48__ Average Width 6 (ft) Average Length 8 „ „m (ft) <br />Average Depth 4 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />NONE <br />D. Other Disturbances (please describe): <br />One Large wash out area to be filled. Approx. 151x151=225sq.ft. <br />area is between drill hole location 26/27 and 44. <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />No_Chemicals,TFuel .mor Oilwill be stored on site. Fuel and Oil for <br />-Drill Ria will be contained on the crew-transport, 4x4 pick-up truck <br />F. New Road(s): NONE Length __..__.m__ (ft) Width <br />Significantly Upgraded Road(s)NONE Length ___.__._._.___ ___.. (ft) Width _-- (ft} <br />Are culverts or other crossings proposed? If so, please describe: NONE