Laserfiche WebLink
G <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Top-Soil will not be removed from the drill-hole pads. The holes <br />will be drilled in or adjacent to existing roads and trails where <br />cut and fill is not required. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />see attachment E "Reclamation" <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />see attachment E "Reclamation" <br />b. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />see attachment E "Reclamation" <br />see attachment G "TESS Report"