My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-22_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2008-05-22_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:55 PM
Creation date
5/23/2008 9:33:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
5/22/2008
Doc Name
Adequacy Review
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
TR16
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Boulay May 21-2008 <br />CAM: Please see amended page 2-26 adding text pertinent to the additional <br />disturbance created with this technical revision application. Page 2-27 was <br />amended based on DRMS' comments listed in item #5. <br />6. DRMS: The Affected and Disturbed Areas Map (Figure 2.2-1) referenced in <br />the Section 2.2 narrative will need to be updated. The disturbed area boundary <br />needs to be revised to incorporate expansion proposed in TR-16. Delineation of <br />underground workings "affected area to date" and "future affected area" will also <br />need to be updated. <br />Please submit an appropriately amended Figure 2.2-1. <br />CAM: Please see amended Figure 2.2-1, and amended page 2-26. <br />7. DRMS: Surface Facilities narrative does not appear to include discussion of <br />the small existing "Storage Area" located adjacent to the haul road east of the <br />existing sediment pond, nor does amended narrative include discussion of the <br />larger proposed "Material Storage Area" (shown on amended Figure 2.2-2), <br />which would be located at the site of the existing sediment pond and sediment <br />storage area. <br />Please provide amended narrative with description of the two storage <br />areas, including the construction details and materials that will be stored in <br />each location. Section 2.2.3 on page 2-34 and 2-35 may be the appropriate <br />location for discussion of these storage facilities. <br />CAM: A section about the `Material Storage Areas' was added to the first <br />paragraph of page 2-34. <br />8. DRMS: Three concerns related to maps associated with the storage areas <br />referenced in Item 7 were noted. First, on both amended Figures 2.2-2 and 2.2-3, <br />there are crossed contour lines along the slope near the northeast and southeast <br />corners of the "Material Storage Area". Second, the sediment containment berm <br />associated with the small existing storage area is not depicted on amended <br />Figure 2.2-3. Third, a rip-rapped diversion ditch would appear to be necessary to <br />safely convey flow from the ephemeral channel east of the proposed Material <br />Storage Area down to Ditch D-7-1, along the south perimeter of the proposed cut <br />slope. <br />Please correct these items on amended versions of Figure 2.2-2 and 2.2-3. <br />CAM: Please see amended SedCad page showing new rip-rapped ditch D-7-3 <br />and the berm shown around the material storage area on amended Figures 2.2- <br />2&3. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.