Laserfiche WebLink
• • <br />2008 CRIPPLE CREEK and VICTOR G LD DEMOLITION COST ESTIMATE <br />Building No. Length Width Avg. Ht. Cu.Ft. $/Cu.Ft.' Cost <br />Crusher Maintenance Building -October 1999 __ _ <br />Addition _ 1 25.0 40.0 17.4 17,400 ~ $0.23. _ $4,002__ <br />Lean to 1 10.0 40.0 12.5 5,000 $0.23 $1,150 <br />SUBTOTAL $5,152 <br />ADR Processing Plant <br />Building. -.ADR 1995 __ <br />_ _ 1 _ _ 165 _ _ 100.._..: „ _ _..51_.5_ 849,750. , _ _ ___ ., ..:.0.23... $ 195,443 <br />Pipe Access Gallery 1995 1 60 10 10. 6,000 0 23 $ 1,380 <br />Carbon Strip & Regen Equip 1995 1 107 25 45 120,375 0.23 $ 27,686 <br />Process Maintenance Trailer 1 60 25 12 18,000 0.23 $ 4,140 <br />ADR Addition North 1999 1 165 43 44 312,180 0.23 $ 71,801 <br />ADR Addition South 2002 1 108 70 56.9275 430,372 0.23 $ 98,986 <br />ADR Process Tanks No. Diameter Height Cu.Ft. /Cu.Ft.' Cost <br />Carbon Columns 1995 10 12.5 11 13,492 0.23 $ 3,103 <br />Intermediate Solution Tank 1995 1 16 40 8,038 0.23 $ 1,849 <br />Solution Tanks Addition 1999 2 12.75 30 __ 7,657 0.23 $ 1,761 <br />Carbon Columns North Addition 1999 5 12.5 11 __ 6,746 0.23 $ 1,552 <br />Carbon Regeneration Kiln 2002 1 3.3 34 291 0.23 $ 67 <br />Carbon Feed Tank 2002 1 10 16 1,256 0.23 $ 289 <br />Carbon Quench Tank 2002 1 9 11.1 706 0.23 $ 162 <br />Carbon Strip Vessel 2002 1 5 30.8 604 0.23 $ 139 <br />Cyanide Mixing Tank 2002 2 12 29.3. 6,624 0.23 $ 1,524 <br />Train D Carbon Columns 2002 5 13 11.75 7,794 0.23 $ 1,793 <br />Pregnant Solution Tank 2002 1 22 14 5,319 0.23 $ 1,223 <br />Train D Head Tank 2002 1 10.675 9 805 0.23 $ 185 <br />Train D Transfer Tank 2002 1 20.687 7 2,352 -0.23 $ 541 <br />Carbon Pre-Dryer 2002 1 20.687 26 8,734 0.23 $ 2,009 <br /> SUBTOTAL $415,632 <br />' 2008 Means Heavy Construction Cost Data, pg. 33. Steel Structures @$0.23 /cf & "mixed" <br />steel w/ concrete structures @ $0.24/cf <br />Total Page 3 = $420,784 <br />