My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (368)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (368)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:21:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 11 Reclamation Cost Model to Support MLEP
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />2008 CRIPPLE CREEK and VICTOR ~LD DEMOLITI N <br />O COST ESTIMATE <br />Water Tanks No. Diameter Height Cu.Ft. $/Cu.Ft.' Cost <br />Water Tanks _ _ _ 2 _ _ Y, _ 25.0__ 28A __ 27,475~_~_ $0..23_ .________$6,319 <br />Water Tanks -Fire Water ~~ ~~~~ 1 ~ 16.0 26.6 5,346 $0.23 $1,229 <br />SUBTOTAL $7 <br />Storage Tanks z No. Diameter Height Cu.Ft. Lump Sum Cost <br />Fuel Storage <br /> <br />100,000 gallon diesel tank <br />2 ~ _ <br />24.0 _ <br />30.00 ' _ <br />27,130 ~ <br />$2,013.00 <br />$4,026 <br /> <br />13000 gal tank <br />- 1 -,-~ <br />- ' 12.0 - <br />- -15.00 <br />1,696 <br />$715.00 -- <br />$715 <br />1000 gal diesel & kerosene 2 4.0 10.60 266 $238.33 $477 <br />500 gallon diesel, tube & hydr oil 3 _ 4.0 5.30 _ 200. $238.33 $715 <br />s Storage tank demolition is based on torch cutting sides of tanks, excavator and D9 dozer handling tanks + 2 laborers <br />SUBTOTAL <br />Trailers and Substation No. Length Width Height Cu.Ft. $/Cu.Ft.' Cost <br />Project Manager Trailer 1 57.0 12.0 10 6,840 $0.23 $1,573 <br />Project Trailer ~__ ~__ 1 40.0 53.0 10 _ 21,200. $0.23 $4,876 <br />FileTrailer __ 1 20.0 10.0 10 2,000 $0.23 $460 <br />Process Maintenance Trailer 1 60.0 25.0 10 . 15,000 $0.23 $3,450 <br />Substation SW of Crusher _1 _ (Lump Sum Estimate) $12,414 <br />SUBTOTAL $22,773 <br />PAC Structures Length Width Avg. Ht. Cu.Ft. $/Cu.Ft.' Cost <br />PAC Demolition -Skid 1 70.0 24.0 1.5 2,520 $0.23 $580 <br /> <br />PAC Demolition -Carbon Columns <br />___ 5.0 <br />6.0 <br />8.5 <br />1,201 <br />$0.23 _ <br />$276 <br />PAC Demolition -Barren Tank 1.0 9.6 6.8 492 $0.23 __ <br />$113 <br />SUBTOTAL <br />2008 Means Heavy Construction Cost Data, pg. 33. Steel Structures @$0.23 /cf & "mixed" <br />steel w/ concrete structures @ $0.24/cf <br />$969 <br />Total Page 2 = $36,255 <br />
The URL can be used to link to this page
Your browser does not support the video tag.