Laserfiche WebLink
S• (. <br />2008 CRIPPLE CREEK and VICTOR LD DEMOLITION COST ESTIMATE <br />Building Length Width Peak Eave Cu.Ft. $/Cu.Ft.' Cost <br />Victor Plant <br />Change Room _ ___ 30 27.0 12.0 8.0 8,100 $0.24 $1,944 <br /> <br />Security <br />10 <br />10.0 <br />10.0 <br />9.0 <br />950 <br />$0.24 _ <br />$228 <br />Laboratory (Engineering) 83 32.0 12.0 8.0 . 26,560 _ <br />$0.24 _ <br />$6,374 <br />Maintenance __ _ <br /> <br />Light Vehicle Shop _ <br />80 <br />56.0 <br />13.0 <br />12.0 <br />56,000 _ <br />$0.23 <br />$12,880 <br />Truck Wash Facility 75 45.0 44.0 40.5 142,594 _ <br />$0.23 $32,797 <br />Truck Shop 305 95.0 65.0 1,883,375 ; $0.23 $ <br />433,176 <br />Mill _ <br />_ <br />Vats #1-4 and Process 175 200.0 30.0 20.0 875,000 ~ $0.23. $201,250 <br />Vats #5-8 demo completed) N/A N/A N/A N/A, N/A N/A N/A <br />Maint. Warehouse 57 200.0 46.5 530,100 $0.23 $121.923 <br />Agglomerator - 20 76.0 34.0 51,680 $0.23 $11,886 <br />Sump/pump 16 15.0 13.0 3,120 $0.23 $718 <br /> <br />Conveyor Shed <br />85 <br />13.0 <br />21.0 <br />23,205: <br />$0.23 _ <br />_ <br />$5,337 <br />Process Corridor 15 175.0 24.0 63,000 $0.23 $14,490 <br />Office Area 40 70.0 16.0 13.0 40,600 $0.23 $9.338 <br />Coblentz Building 140 60.0 20.0 168,000 ' $0.23 $38,640 <br /> SUBTOTAL $890,981 <br />Victor Plant Retaining and Stem Walls Length Height Sq.Ft. $ / Sg Ft. s Cost <br />_ Maintenance/1Narehouse 220 __ 6.0 ; 1,320 $10.20 $13,464 <br /> <br />Conveyor Recess <br />63 <br />12.0 _ <br />756 <br />$10.20 _ <br />$7,711 <br />Steel Column & Wood Retaining Wall Lump Sum <br />SUBTOTAL $3,000 <br />$24,175 <br />Victor Plant Process Area No. Diameter Radius Height Cu.Ft. $/Cu.Ft.' Cost <br />Fresh Water 1_ _ 22 11.0 .18.0 6,839. $0.23 $1,573 <br />Detox 1 10 5.0 18.0 1,413 $0.23 $325 <br />Preg 4 22 11.0 18.0 27,356 $0.23 _ _ $6,292 _ <br />Fire Water 1 28 14.0 18.0 11,078 $0.23 V $2,548 _ <br />2008 Means Heavy Construction Cost Data, pg. 33. Steel Structures @$0.23 /cf & "mixed" SUBTOTAL $10,738 <br />steel w/ concrete structures @ $0.24/cf <br />ZPro-rated using historic costs and Means. Total Page 4 = $925,894 <br />