Laserfiche WebLink
• • <br />2008 CRIPPLE CREEK and VICTOR ~LD DEM LITION COST E T <br />O S (MATE <br />Bulk Emulsion Facility <br />Building Length Width Peak Eave Cu.Ft. $/Cu.Ft.' Cost <br />Main Building _ ~ 60 40.0 17.0 12.0 ~ 34,800 ; $0.23 ~~ $8,004 <br /> Height <br /> <br />Small Bulk Bin <br />! 10 10.0 20.0 - _ <br />` 2,000 -- <br />_~ $0.23 __$46_0__ <br />Stem Walls Sq. Ft. _ $_ / Sq Ft. 2 <br />Building ~ 140 2.0 280 ~ $10.20 ~ $2.856 <br />Solution Tank Containment -9-6------- ---------2.0- --- 1 192 ! $1-0.20, $1,958 <br />Fuel Tank Containment ' S6 2.0 112 ; $10.20 ~ $1,142 <br />Outside Fuel Tank Containment 42 2.0 84 ~ $10.20 $857 <br /> No. Diameter Radius Height Cu.Ft. $/Cu.Ft.' Cost <br />_Bulk Bins _ _ 4 0 - - - $0.23 $0 <br />SST Solution Tanks ___~__ ~ 2 12 6.0 15.0 ~ 3,391 ; $0.23 ~ $780 <br />Fuel Holding Tank _ 1 10~ 5.0 10.0; 785 ; $0.23 ~ $181 <br />Fuel Holding Tank __ 1 8 _4.0 <br />~ 10.0 502 J $0.23 ~ $116 <br />Outside Fuel Holding Tank __ ~ 1 10 ~ 5.0 10.0 i 785 ; $0.23 ~ $181 <br />Prill Silo 4 10.0 20 25,120 $0.23 , $5,778 <br />Engineering Facility <br />New Engineering Building (2007) '_ <br />_ 9,324 <br />` sf =footprint area ` <br />_ ___.13.0! <br />121,212 <br />$0.24 <br />$29,091 <br />SUBTOTAL $51,403 <br />Total Page 5= $51,403 <br />DEMOLITION GRAND TOTAL PAGES 1 - 5 = $2,081,449 <br />2008 Means Heavy Construction Cost Data, pg. 33. Steel Structures @$0.23 /cf & "mixed" <br />steel w/ concrete structures @ $0.24/cf <br />ZPro-rated using historic costs and Means. _ <br />