Laserfiche WebLink
• approximately 4184.5 acres, not including the permitted acreage at the Carlton Tunnel <br />(15.4). Table 1-1 shows the proposed total disturbance by category for the MLE. <br />• <br /> <br />Table 1-1 O eratin Disturbance Areas <br />Site Facility or Area Mine Life Extension <br />(approximate area in <br />acres <br />Minin Areas <br />Main Cresson Mine Area 585.6 <br />East Cresson Mine Area 581.5 <br />North Cresson Mine Area 322.0 <br />Total Mine Areas 1498.1 <br />Overburden Stora a Areas <br />S uaw Gulch OSA 363.1 <br />S uaw Gulch OSA Extension 78.7 <br />ECOSA 174.5 <br />Total Overburden Stora a Areas 616.3 <br />Valle Leach Facili <br />Phase I throu h IV 376.5 <br />Phase 5 137.7 <br />Total VLF Area 514.2 <br />Other Su ort Features <br />Crusher and Fuel Island 66.6 <br />Ironclad 39.5 <br />ADR/Carlton 35.6 <br />Mine Access Roads and Haul Roads <br />Outside Other Disturbance Areas 15.2 <br />Growth Medium Stockpiles Outside <br />Other Disturbance Areas 44.7 <br />Total Su ort Facilities 201.6 <br />Total Ma'or Disturbance 2830.2 <br />Ancilla Disturbance 1354.3 <br />Total Affected Areas Associated with <br />Cresson Mine Under Mine Life <br />Extension 4184.5 <br />Carlton Tunnel Area 15.4 <br />Total Affected Area Under M-1980- <br />244 Mine Life Extension 4199.9 <br />Ancillary disturbance as included in Table 1-1 refers to disturbance associated with <br />limited and/or temporary activities occurring outside of the identified disturbance areas. <br />Such activities can include exploration drilling, sediment or drainage controls, access <br />roads, incidental survey work, or other activities. Ancillary disturbance is included in the <br />financial warranty for the site as minor disturbance requiring limited grading and <br />revegetation. <br />Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />1-6 <br />