My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
4/4/2008 2:01:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Cost Estimate Memo
From
Jim Stark
To
Joe Dudash
Type & Sequence
Rn5
Email Name
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />N <br />:~' ~ ~ Bowie No. 1 Mine C-81-038 <br />Task: 000 ;Site: Bowie No. 1 Mine ! Date: 21 Nov 07 User: JR <br />Permit Action: ___-- -- - _~°LV ,S .._ _ _-.-- -- _-- County_-- -- Delta _-_ -__ <br />DescriQion_ _ .Cost Summary .File Name: C-1981-038 <br />Task Reclamation Task Descriatioo _ Hours Direct Cost <br />~74 -Recut Haul Road Ditches 3.59 _ _ _ $502.00 <br />-- <br />75 _ <br />- <br />-Construct 2730' of 3' Ditches 6.21 $868.00 <br />76 -Construct 4340' of 12' Ditches _ 35.96 _ $5,021.00 <br />- -- <br />78 _ <br />_ _ __ <br />-Backfill OVM Pipeline Removal Trench <br />_._ 0.97 $1,037.00 <br />- <br />~79 - __ <br />-Establish Irrigation Ditch at Storage and Loadout 1.71 $239.00 <br />X81 _ <br />-Riprap Placement 4.04 $15,838.00 <br />085 -Backfill and Regrade Pond 1 . _ _ <br />086 -Backfill and Regrade_Pond 2 __ _ ___ ___ ___ _______-_ <br />087 -Backfill and Regrade Pond 3 <br />088 -Backfill and Re de Pond 4 <br />089 -Remove Concrete Pond Dams ___ ___ _ <br />091 -Backfill and Regrade_Waste Pile Pond <br />092 -Backfill and Regrade Timber Storage Pond _ __ <br />093 ~-Backfill and Regrade Coal Stockpile Pond <br />095 -Backfill and Regrade_Pond W _ i_ <br />096 -Backfill and Regrade Pond_W-2 _ <br />3.05 _ $632.00 <br />_ <br />2.47 $514.00 <br />2.52 $524.00_ _ ___ <br />2.91 $605.00 <br />10.77 $1,503_00----- <br />_...------ -- <br />- - ---- <br />2.31 - -- - <br />$479.00 <br />2 <br />.83 $586.00 <br />_ <br />- ---- ----- - - -1.00 - - $208.00 <br />2.88 $597.00 <br />2.88 $597.00 <br /> <br />100 _ <br />-Replace Topsoil from Stockpile to Waste Disposal Area <br />_ 4 89 -- <br />$5,256.00 <br />-- <br />_ <br />101 _ <br />-Move Fill Topsoil Pile into Stockpiled Area <br />_ _ 25 75 <br />- -- - $27,674.00 <br /> <br />-- <br />102 -- <br />-Replace Topsoil from Stockpile_to OVWM 47 66 $51 211.00 <br />--- <br />103 -Replace_Topsoil from Stockpile to Replaced Fill 11.49 $12,349.00 <br />_.. _ <br />104 Topsoil from Stockpile to OVWM Vent Shaft Access <br />-Replace <br />_._ _. 2.84 $3,055.00 <br />105 _ <br />_ _ _ <br />-Haul Stevens Gulch Topsoil_to OVM _ 5.94 _, $10,167.00 <br />106 -Redistribute Topsoil at Truck Dump Station 0.44 <br />- --- - $478 00 <br /> <br />---- - <br />-. <br />I07 -Replace Topsoil from_Stockpile_to OVM Main Diversion Ditch 0.44 $550.00 <br />-- - <br />108 ,-Replace Topsoil from Stockpile to Remaining Mine Site 12.71 _$20,008.00 <br />109 _ <br />-Replace Topsoil from OVWM Slide Area 0 30 $324.00 <br />110 -Replace Topsoil from Stockpile to TR-38 Drill Pad 0.09 _ $95.00_ _ <br />-- -- _ <br />111 -Replace Topsoil from Stockpile to TR 38 Light_Use Road 0.81 $874.00 <br />112 -Replace Topsoil from Stockpile to Pond W 1 1 55 $321.00 <br />1 13 -Replace_Topsoil from Stockpile to Pond W-2 1.55 $321.00 <br />1 18 -Seal OWM and OVWM Vent Shafts <br />.. - 120 00 <br />-- $59,057.00 <br />- <br />125 ~ - <br />-Plug and Seal All Boreholes 105.00 $35,559.00 <br />130 ~-Revegetate OVM 20.00 $33,701.00 <br />131 -Revegetate OV WM 24.44 $41,182.00 <br />_ <br />132 -Revegetate Remainder of Mine Site 82.28 $58,870.00 <br />133 -Revegetate Narrowed Haul Road Outslope 6.76 $1 I ,391.00 <br />137 -Demolish and Remove All Structures 400.00 $293,402.00 <br />146 -MobilizelDemobilize Equipment for Initial Reclamation 12.29 $44,266.00 <br />147 -MobilizelDemobilize Equipment for Pond Cleaning 6.00 $2,422.00 <br />148 -MobilizelDemobilize Equipment for Pond Removal 6.00 $3,026.00 <br />149 -MobilizelDemobilize Equipment for Site Maintenance 24.00 $43,001.00 <br />Summary Sheet Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.