Laserfiche WebLink
SCANNED '~~` s <br />Bowie No. 1 Mine C-81-038 <br />Cask: 000 Site: Bowie No. 1 Mine Date: Z I Nov 07 User: JRS <br />... -- - <br />-- <br />'ermit Action: ~ ~N -5_ _ County _ _. Delta _- _ _ - ___-- - <br />~escription: 'Cost Summary _ _ .File Name: C-1981-038 <br />Reclamation Task Descriation Hours Direct Cost <br />-- Task <br />001 -Push Fill from Zone 1-A to Zone 4-A at C&S Bench _ _197.83 $212,587.00 <br />_ _ _ _ <br />- <br />002 -- <br />-Push Fill from Substation Zone 1-D to Road Cut Zone 2-D _ _ <br />_ 0.35_ _ <br />$377.00 <br />_ <br />003 _ _ <br />-Push Fill from Substation Zone 1-D to Road Cut Zone 2-E _ _ _ 0.63 $678.00 <br />_._. _ _. <br />004 _ <br />-Push Fill from Outslope Zone 2-B to Portal Zone 4-C ~ <br />0.10 <br />_ $107.00 <br />_ <br />005 -Push Fill from Zone 1-C to Water Tank Bench Zone 3-C _ __ 83.04 $89,288.00 <br />_ _ <br />006 _ _ <br />-Push Fill from Highwall Zone 4-D to Portal Zone 4-C _ 2.74 $2,939.00 <br />_ <br />007 -Push Fill from East Highwall Zone 4-D to West Zone 4-D _ _ 1 93 $2,071.00 <br />_ _ <br />008 _ _ _ _ _ <br />-Haul Fill from C&S Zone 1-A to Portal Zone 4-C 121.03 $_209 351.00 <br />009 _ <br />-Haul Fill from Storage Zone 1 -B to Road Cut Zone 2-C 0.83 _ $1,035.00 <br />010 Storage Zone 1-B to Portal Zone 4-C <br />-Haul Fill from _ 7.71 $13,410.00 <br />011 _ <br />-Haul Fill from ROM Area to Portal Zone 4-C 25.81 $44,156.00 <br />012 -Haul Fill from ROM Area to Diversion Zones 3-A, 3-B and 3-C 284.28 $484,091.00 <br />- -. <br />013 -Haul Fill from Storage Zone 1-B to Warehouse Zone 2-A 49.50 $37 971.00 <br />_. <br />014 -Haul Fill from Stora a Zone i-B to Coal Zone 4-B _ _ <br />g <br />- --- -- -- - -- 31.49 <br />- - -- --- _ $24,152.00 <br />_ --- ---- ----- <br />---- - <br />O15 - - --- - - <br />--- ---.- ---------------- <br />-Haul Fill from Zone 1-E to Zone 2-D 0.34 _ $261.00 <br />016 -Haul Fill from Zone 1-D to Zone 4-C 3.22 $2,470.00 <br />017 West Mine <br />~-Backfill Orchard Valle <br />-- - - _. - - <br />y 24.09 <br /> <br />- - <br />_ - - $_ 25,888.00 <br />- - <br />- <br />- - <br />019 _ <br />- - --- <br />--- -- - - - - - <br />-Regrade TR-38 Drill Pad 1.14 $305.00 <br />_ <br />025 _ _. _ _ _ <br />-Place Four Feet of Cover Material on Waste Disposal Area <br />6.40 <br />$6,877.00 <br />_ <br />026 ___-- -- <br />-Remove Temporary Waste Pile to Waste Disposal Area 2.61 _ __ $3,662.00 <br />___ <br />027 -Haul Footprint of Coal and Mine Stockpiles to_Refuse Area 5.68 $7,012.00 <br />032 -Compact Waste Pile 92 54 <br />_. _ _$12,341.00 <br />-- <br />033 --- <br />-Compact OVWM Road Backfill 25.34 $3,379.00 <br />034 __ _ _-Compact Zones 2-A, C D and E; 3-A, B and C; 4-A, B and C 434.52 $57,946.00 <br /> <br />038 <br />-Rip Cut Zones 1-A, B, C, D and E, 2 B; 4-D - - - - <br />27.72 .. <br />$23,881.00 <br />041 -Rip Roads 0.12 $105.00 <br />_ <br /> <br />045 _ _ <br /> <br />-Remove Gravel on Roads to Ponds 3 and 4 _ _ <br />--- <br />2.19 - <br /> <br />$1,678.00 <br />049 _ <br />-Regrade OVWM Light Access Road 4 38 $612.00 <br />- - <br />O50 -Regrade Timber Storage Access Road <br />- - _ . 8.36_ <br />_ _ $1,168.00 <br />- <br />052 - <br />-Regrade Old Waste Disposal Road _ <br />8.36 $1,168.00 <br />053 -Regrade West Ridge Disposal Area 4.18 $584.00 <br />054 -Finish Grade Lower Waste Disposal Road 0.08 $9.00 <br />055 -Rip Outer 22'of Asphalt Haul Road 0.10 $84.00 <br />056 -Haul Asphalt from Haul Road to Portal Bench Zone 4-C t .90 $3,000.00 <br />057 -Rip Outslope of Haul Road 0.22 $193.00 <br />058 -Excavate Haul Road Outslope and Place at Toe 19.49 $2,721.00 <br />059 -Regrade, TR-38 Light Use Road 2.62 $2,813.00 <br />063 -Finish Grade All Reclamation Zones (1-4) 23.78 $2,763.00 <br />064 -Finish Grade Upper Waste Disposal Road 0.22 $25.00 <br />065 -Finish Grade Crushing and Screening Road 0.08 $9.00 <br />066 -Finish Grade OVWM 2.10 $244.00 <br />.068 -Finish Grade Waste Disposal Area 6.15 $715.00 <br />1069 -Finish Grade ROM Storage Area 4.61 $536.00 <br />Summary Sheet Page 1 of 3 <br />