My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
4/4/2008 2:01:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Cost Estimate Memo
From
Jim Stark
To
Joe Dudash
Type & Sequence
Rn5
Email Name
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r• <br />Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL-03 <br />Applicable Cost Summary Sheet <br />Task: 000 Site: Bowie No. 1 Mine Date: 15 Nov 07 ' User: JRS <br />Permit Action: Partial Phase [Bond Release SL-03 County ________ .Delta <br /> <br />Description:__ _ __. <br />Cost Summary _ _ _ <br />File Name: <br />C-1981-038 <br />Task Reclamation Task Descriution _ _ __Hours_ _ _ __ _! Direct Cost <br />201 Seal Loadout Wells Not Released $0.00 <br />202 Demolish and Remove Structures at Loadout 525.00 $1,554,653.00 <br />203 Combined with Task 202 0.00 $0.00 <br />204 of Loadout Stockpiles to Refuse Area <br />Haul Footprints Not Released $0.00 <br />_ _ <br />205 _ <br />. <br />__ <br />Storage/Loadout Area <br />Rip <br />Coal Not Released $0.00 <br />_ __ <br />206 _ <br />_ <br />_ <br />~ Excavation/Grading at Storage Area and Loadout Not Released $0.00 <br />207 Grade Railroad Spur Not Released $0.00 <br />208 Finish Grade Railroad Spur Not Released $0.00 <br />_ <br />209 ____ <br />,Replace Topsoil from Stockpile to Truck Dump Station _ _ __ _ : _ ___ Not Released__ __ _ _ _ _ $0.00 _ ______ <br />----- --- <br />210 -- - - - <br />Reseed Train Loadout and Coal Stockpile Areas _ __ ____ <br />~ Not Released <br />$0.00 <br />211 Remove Coal Stockpile Pond ~ Not Released $0.00 <br />212 _ _____ ___ _ __ <br />;Remove Train Loadout Pond _ Not Released ' $0.00 <br />Total Indirect Costs ~ ~ $1,554,653.00 <br />Liability Insurance (1.55%) $24,097.12 <br />Performance Bond (1.05%) _ _ $16,323.86 <br />Profit (10%) $155_ ,465.30 <br />_ _ _ Job Superintendant (300 hours @ $37.50/hour) 525 00 $11,250.00 <br />Total Contract $1,761,789.28 <br />Engineering Fees (4.25%) $74,876.04 <br />Administrative Costs (3.25%) _$57,258.15 <br />Total Applicable Loadout Liability S1 <br />Summary Sheet Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.