My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
4/4/2008 2:01:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Cost Estimate Memo
From
Jim Stark
To
Joe Dudash
Type & Sequence
Rn5
Email Name
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~N :s <br />s,.,~' ~ ~ Bowie No. 1 Mine C-81-038 <br />Task: 000 Site: Bowie No. 1 Mine _ _ _ _ . Date: 21 Nov 07 ~ User: JRS <br />Permit Action: -- 12N .5-- _-- - - --__- .-- ---.County _ ___- _ Delta -_--- ---- <br />Description: _ _ ___-. _--. _-- <br />Cost Summ 'File Name: C-1981-038 <br />-- ------------- <br />Task <br />Reclamation Task Descr~otion <br />Hours ----- <br />Direct Cost <br /> <br />.153 __ <br />-Proctor Testing Backfilled Matena( ___ _ <br />20.00 <br /> <br />- - _ <br />,_ $702.00 <br />--- <br />- - - <br />154 _ _ <br />-Nucleaz Density Testing Backfill _ 40.00 $25,302.00 <br />155 - <br />-Water Truck for Backfill Moisture Augmentation _ _ _ 450.00 _ $40,751.00 <br />158 -Yearly Site Maintenance and Pond Cleaning __ 240.00 $370,550.00 <br />201 Seal Loadout Wells _ 12.00 _ _ $3,545.00 <br />202 Demolish and Remove Structures at Loadout 175.00 $703,538.00 <br />_ _ __ __ _ __ <br />Task 203 Combined with Task 202 During SL-03 and RN-OS <br />204 of Loadout Stockpiles to Refuse Area <br />Footprints <br />Haul 4.60 $7,814.00 <br />205 _ <br />_ <br />Rip Coal Storage/Loadout Area 0.44 <br />- - - $381.00 <br />206 Storage Area and Loadout <br />Excavation/Grading at _ 34.33 $36,889.00 <br />207 _ <br />Grade Railroad Spur 50.42 _ $54,182.00 <br />208 Finish Grade Railroad Spur 19.52 ___ __ $2,268.00 <br />_._ <br />209 Replace Topsoil from Stockpile to Truck Dump Station 0.59 $639.00 <br />210 Reseed Train Loadout and Coal Stockpile Areas 80.00 $41,033.00 <br />211 _ <br />Remove Coal Stockpile Pond 1.00 $208.00 <br />212 _ _ <br />Remove Train Loadout Pond __ _ 8.74 $1,814 00 <br /> Total Indirect Costs <br />- --:. -- --- -- - - --- - $3 362,588 00 <br />- __ _ _z. -- - _ <br /> Liability Insurance (1 55%) $52,120.11 <br />--- <br /> Performance Bond (1.05%) $35,307.17 <br /> Profit (10%) $336,258.80 <br />---- <br />_ _ _ <br />_ _ Job Superintendant (1,200_hours @ $41.25/hour) 3,665.78 $49,500.00 <br /> Total Contract $3,835,774.09 <br />_ <br />I <br />Engineering Fees (4.25%)_ __ _ <br />$163,020.40 <br />_ Administrative Costs (3.25%) $124,662.66 <br /> Total Liabilit $4,123,457.14 <br />Summary Sheet Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.