• r~ <br />, ~' ~ ~ Bowie No. 1 Mine C-81-038 N <br />000 Site: Bowie No. 1 Mine <br />t Action: ~ _ ~/~/: ,,,5 <br />IQion_ _ Cost Summary _ __ _ _ . <br />Task Reclamation Task Description <br />Date: 21 Nov 07 User: JRS <br />__ County __ Delta _ ____ __ <br />~FileName: ~ C-1981-038 <br />- --- -- _ -_ Hours - - -Direct Cost -- <br />X74 -Recut Haul Road Ditches _ _ _ _ _ _ _ 3.59 $502.00 <br />X75 _ <br />-Construct 2730' of 3' Ditches _ _ _ 6.21 $868.00 <br />X76 _ <br />-Construct 4340' of 12' Ditches 35.96 <br />_ $5,021.00 <br />_._ <br />X78 _ __ <br />Removal Trench <br />-Backftll OVM Pipeline ! 0.97 $1,037.00 <br />X79 ~ _ <br />-Establish Irrigation Ditch at Storage and Loadout ___ _ _ 1.71 $239.00 <br />X81 -Riprap Placement 4.04 $15,838.00 <br /> <br />~85 <br />-Backftll and Regrade Pond 1 _ __ <br />__ 3.05 _ -- <br />_ _ _$632.00 <br />_ <br />X86 -Backftll and Re de Pond 2 2.47 $514.00 <br />X87 -Backftll and Re ade Pond 3 _ _ 2.52 $524.00 <br />X88 -Backftll and Re~rade Pond 4 _ __ 2.91 $605.00 <br />X89 -Remove Concrete Pond Dams 10.77 $1,503.00 <br />X91 Pond <br />_ _ <br />Waste Pile <br />-Backftll and Regrade 2.31 _ _$479.00 <br />~92 __ ____ __ <br />. <br />_ <br />Pond <br />_ <br />-Backfill and Regrade Timber Storage 2.83 $586.00 <br /> <br />93 _ <br />_ <br />- -- - <br />'-Backfill and Regrade Coal Stockpile Pond <br />1 00 <br />~ $208.00 <br />95 Pond W- 1 <br />-Backfill and Regrade 2 88 $597.00 <br />96 _ <br />_ <br />-Backfill and Regrade Pond W-2 2 88 $597.00 <br />100 -Replace Topsoil from Stockpile to Waste Disposal Area_ 4 89 $5,256.00 <br />101 -Move Fill Topsoil Pile into Stockpiled Area <br />_ . 25 75 $27,674.00 <br /> <br />_-. <br />102 __ <br />-Replace Topsoil from Stockpile to OVWM 47 66 $51,211.00 <br />-- <br />103 Topsoil from Stockpile to Replaced Fill <br />-Replace 11.49 $12,349.00 <br />104 _ <br />Topsoil from Stockpile to OVWM Vent Shaft Access _ _ , <br />-Replace _ _ 2.84 __ _ _ $3,055.00 <br />105 _ <br />_ __ _ <br />-Haul Stevens Gulch Topsoil to OVM <br />-- --- ---- __. _. 5.94 <br /> <br />_ ._ _ <br />_ __ $10,167.00 <br />--- ----_-- <br />------- <br />106 -- _~_- _ .._.- -- ----- <br />-Redistribute Topsoil at Truck Dump Station 0.44 <br />- $478 00 <br />-T <br />107 _ <br />_ <br />-Replace Topsoil from Stockpile_to OVM_Main Diversion Ditch 0.44 $550.00 <br /> <br />108 _ <br />_. _ <br />-Replace Topsoil from Stockpile to Remaining Mine Site _ _ <br />12.71 <br />$20,008.00 <br />_. <br />109 -Replace Topsoil from OVWM Slide Area 0.30 <br />_ . _ _ <br />$324.00 <br />-- <br />110 -Replace Topsoil from Stockpile to TR-38 Drill Pad 0.09 $95.00 <br />_ __ <br />111 from Stockpile to TR 38 L~ght_Use Road <br />-Replace Topsoil <br />-. 0 81 $874.00 <br />- -- <br />112 , <br />-Replace Topsoil from Stockpile to Pond W- 1 1 55 $321.00 <br />-- <br />1 13 -Replace Topsoil from Stockpile to Pond W-2 1 55 $321.00 <br />118 -Seal OWM and OVWM Vent Shafts 120.00 $59,057.00 <br />125 -Plug and Seal All Boreholes 105.00 $35,559.00 <br />130 -Revegetate OVM 20.00 $33,701.00 <br />131 -Revegetate OV WM 24.44 $41, 182.00 <br />132 -Revegetate Remainder of Mine Site 82.28 $58,870.00 <br />133 -Revegetate Narrowed Haul Road Outslope 6.76 $11,391.00 <br />~ 137 -Demolish and Remove All Structures <br />400.00 $293,402.00 <br />146 -MobilizelDemobilize Equipment for Initial Reclamation 12.29 $44,266.00 <br />147 -MobilizelDemobilize Equipment for Pond Cleaning 6.00 $2,422.00 <br />148 -MobilizelDemobilize Equipment for Pond Removal 6.00 $3,026.00 <br />149 -MobilizelDemobilize Equipment for Site Maintenance 24.00 $43,001.00 <br />Summary Sheet Page 2 of 3 <br />