Laserfiche WebLink
.- ~~CAI~NED <br />~~-5 <br />Bowie No. 1 Mine C-81-038 <br />Task: 000 No. 1Mine <br />wi <br />Site <br />: <br />Bo <br />e Date: 21 Nov 07 User:1RS <br /> <br />Permit Action: __ <br />_ <br />_ <br />_ <br />_ <br />- - - -- - t2/V - . - - - <br />~ Coun <br />- ZY -. Delta <br />Description: - - -- -- - ---- - - <br />:Cost Summary .File Name: C-1981-038 __ <br />Task Reclamation Task Description Hours erect ost <br />001 -Push Fill from Zone 1-A to Zone 4-A at C&S Bench _ 197.83 $212,587.00 <br />_ _ _ <br />002 _ <br />-Push Fill from Substation Zone 1-D to Road Cut Zone 2-D _ 0.35_ _ $377.00 <br />_.. <br />- - <br />003 to Road Cut Zone 2-E _ <br />-Push Fill from Substation Zone 1-D _ _ 0.63 $678.00 <br />-- <br />_ _ _ <br />004 _ <br />-Push Fill from Outslope Zone 2-B to Portal Zone 4-C _ ~ 0.10 _ $107.00 <br />005 _ <br />-Push Fill from Zone I-C to Water Tank Bench Zone 3-C _ __ 83.04 _ $89,288.00 <br />00 <br />6 _ <br />-Push Fill from Highwall Zone 4-D to Portal Zone 4-C _ 2 74 $2,939.00 <br />--- <br />_ _ <br />_ <br />007 -Push Fill from East Highwall Zone 4-D to West Zone 4-D 1 93 $2,071.00 <br />---- - <br />008 -Haul Fill from C&S Zone 1-A to Portal Zone 4-C _ (21.03 $209,351.00 <br />_ __ _ ._ <br />009 -Haul Fill from Storage Zone 1 -B to Road Cut Zone 2-C _ 0.83 _ $1,035.00 <br />010 -Haul Fill from Stora a Zone 1-B to Portal Zone 4-C __ 7 71 _ $13,410.00 _ <br />011 -Haul Fill from ROM Area to Portal Zone 4-C 25 81 $44,156.00 <br />012 -Haul Fill from ROM Area to Diversion Zones 3-A, 3-B and 3-C _ <br />284.28 $484,091.00 <br />013 -Haul Fill from Storage Zone 1-B to Warehouse Zone 2-A <br />- 49.50 $37,971.00 <br />014 -- <br />-Haul Fill from Storage Zone 1-B to Coal Zone 4-B 31.49 $24,152.00 <br />015 -Haul Fill from Zone 1-E to Zone 2-D 0.34 $261.00 <br />016 -Haul Fill from Zone 1-D to Zone 4-C _ <br />---- _-- --- -- _ 3.22 <br />_._ -- . $2,470.00 <br />_.. _ - ---- <br />_--- <br />--- ---- ---.. -_ <br />017 __.~.__ - --.y __ _ -- <br />-Backfill Orchard Valle West Mine 24.09__ $25,888.00 <br />019 -Regade TR 38 Drill Pad 1.14 $305.00 <br />_ ___ _ _ __ <br />025 <br />-Place Four Feet of Cover Material on Waste Disposal Area <br />6 40 <br /> <br />_ <br />$6,877.00 <br />-- <br />-_ <br />026 _ .. _ <br />__-- <br />-Remove Temporary Waste Pile to Waste Disposal Area 2 61 $3,662.00 <br />-- -._ <br />027 _ <br />-Haul Footprint of Coal and Mine Stockpiles to_Refuse Area 5 68 $7 012.00 <br /> <br />032 <br />-Compact Waste Pile _ <br />92 54 _ __ _. -- <br />__$12,341.00 <br />- <br />033 _ <br />-Com act OVWM Road Backfill <br />P <br />__-._. <br />- - -- ---_ ----- - ---- <br />25 34 <br />--- _.._ ____ <br />$3,379.00 <br /> <br /> <br />__ <br />- - - _ <br />- - <br />-- - ---- - - -.._ <br />034 .__..- - _ <br />- - <br />-Compact Zones 2-A, C, D and E; 3-A, B and C; 4-A, B and C 434 52 __ _ $57,946.00 <br /> <br />038 <br />-Rip Cut Zones I-A, B, C, D and E, 2 B; 4-D - -- - <br />27.72 .. <br />$23,881.00 <br />041 -Rip Roads_ 0.12 $105.00 _ <br />045 -Remove Gravel on Roads to Ponds 3 and 4 2.19 $1,678.00 <br />049 -Regrade OVWM Light Access Road _ 4.38 __ _ $612.00 <br />050 -Re ade Timber Stora a Access Road _ <br />i~' g _. _ _ - - 8.36_ <br />- _ . _ $1,168.00 <br />- <br />-- <br />052 _ <br />-Regrade Old Waste Disposal Road 8.36 $1,168.00_ <br />053 -Regrade West Ridge Disposal Area 4.18 $584.00_ <br />054 -Finish Grade Lower Waste Disposal Road 0.08 $9.00 <br />055 -Rip Outer 22'of Asphalt Haul Road 0.10 $84.00 <br />056 -Haul Asphalt from Haul Road to Portal Bench Zone 4-C 1.90 $3,000.00 <br />057 -Rip Ouislope of Haul Road 0.22 $ 193.00 <br />058 -Excavate Haul Road Outslope and Place at Toe 19.49 $2,721.00 <br />059 -Regrade, TR-38 Light Use Road 2.62 $2,813.00 <br />063 -Finish Grade All Reclamation Zones (I-4) 23.78 $2,763.00 <br />064 -Finish Grade Upper Waste Disposal Road 0.22 $25.00 <br />065 -Finish Grade Crushing and Screening Road 0.08 $9.00 <br />066 -Finish Grade OVWM 2.10 $244.00 <br />068 -Finish Grade Waste Disposal Area 6.15 $715.00 <br />069 -Finish Grade ROM Storage Area 4.61 $536.00 <br />Summary Sheet Page 1 of 3 <br />