My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
4/4/2008 2:01:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Cost Estimate Memo
From
Jim Stark
To
Joe Dudash
Type & Sequence
SL3
Email Name
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` ,eiv -5 <br />< *.~ Bowie No. 1 Mine C-81-038 <br />Task: 000 Site: Bowie No. 1 Mine _ _ _ _ Date:_21_ Nov 07 ~ User: JRS <br />Permit Action: ~ <br />-. f2N ~- - ---- - -.County- -. - _ Delta- ----- --- <br />Descri lion: <br />----- P -- - <br />Cost Summ <br />- - -~ -- - ~ . - --- - - - - -- -- --- - 'File Name: <br />- ~--- -- --- - - -- C-1981-038 <br />---- - - - ------- - <br />----- ------- <br />Task - <br />Reclamation Task Descriation <br />Hours ----- <br />Direct Cost <br />__. . <br />153 <br />-Proctor Testing Backfilled Material _ _ <br />20.00 <br />._ 702.00 <br />154 -Nucleaz Density Testing Backfill ___ _ _ _ 40.00 _ $25,302.00 _ <br />155 -Water Truck for Backfill Moisture Augmentation _ _ _ 450.00 $40,751.00 <br />158 -Yearly Site Maintenance and Pond Cleaning __ _ ~ 240.00 $370,550.00 <br />201 Seal Loadout Wells _ 12 00 _ _ $3,545.00 <br />202 Demolish and Remove Structures at Loadout _ _ _ _ _ _ _ 175.00_ $703,538.00 <br /> Task 203 Combined with Task 202 During SL-03 and RN-OS <br />204 of Loadout Stockpiles to Refuse Area <br />Haul Footprints 4.60 $7,814.00 <br />_ <br />205 _ <br />Rip Coal Storage/Loadout Area 0.44 $381.00 <br />206 Storage Area and Loadout <br />Excavation/Grading at __ _ _ 34.33 $36,889.00 <br />207 _ <br />Grade Railroad Spur 50.42 $54,182.00 <br />208 Finish Grade Railroad Spur 19.52 $2,268.00 <br />209 Replace Topsoil from Stockpile to Truck Dump Station ____ ____ _ _ _______ ___ __ _ _ 0.59 __ __ __ _ ^_ ____$639.00 __ ___ <br />210 _ <br />Reseed Train Loadout and Coal Stockpile Areas 80 00 $41,033.00 <br />211 Remove Coal Stockpile Pond 1 00 $208.00 <br />212 Remove Train Loadout Pond 8 74 $1,814.00 <br />------- - -- - -- _ -- -- - ---- - --- - --- - -- -------- --- - ------------ - <br />Total Indirect Costs - --=---- -___- - --- - -- --- --------------- <br />$3 362,588 00 <br /> Liability Insurance (1 55%) <br />- <br />-- -- $52,120.11 <br />- - <br /> _ __ <br />_ _- <br />Perfonnance Bond (1.05%) <br />_-- - - __._ <br /> <br />_..._ __ <br />$35,307.17 <br />---- -- -- - - __ -.a _. .. -- ----- <br />Profit 10 /o $336,258.80 <br /> Job Superintendant (1,200_hours @ $41.25/hour) ____ 3,665.78 $49,500.00 <br /> Total Contract $3,835,774.09 <br />--- -.._._ _ _ .__ .. ..-_....- -- __-- -_ _ . _ o__ _. _ .. _..._ _._ <br />Engineering Fees (4.25 /o)_ _ ...._ - _ __ _ $163,020.40 <br /> Administrative Costs (3.25%) $124,662.66 <br /> Total Liabilit $4,123,457.14 <br />Summary Sheet Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.