Laserfiche WebLink
_. <br />RC1AI'1~RI F EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 3/4 T. $30.93 1 $30.93 $30.93 <br />-Flatbed Truck, 4x2, 15K GVW $49.28 1 $49.28 $49.28 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $80.21 $80.21 <br />_.. ._ <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Nucla <br />Transportation Cycle Time : Non- Total one-way travel distance : 25.0 miles <br />Roadable Roadable Average travel speed : 30.0 mph <br />Equipment Equipmen <br />Haul time (hours) = 0.83 0.83 <br />Return time (hours) = 0.83 0.83 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 2.67 1.67 <br />JOB TIME AND COST <br />Total non-roadable mob/demob cost * : $1,057.84 <br />`two round trips with haul rig <br />Total roadable mob/demob cost ** : $133.68 <br />*` one round trip, no haul rig <br />