Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILIi <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task # : 04a State :Colorado <br />Date :07/02/2008 <br />User : GRM <br />County :Montrose <br />Site :Atkinson Mesa <br />Permit or otherjob action :Final Reclamation Liability Estimate <br />Task description :Initial Mobilization to site <br /> <br />;; <br />. < ...... <br />EQUIPMENT TRANSPORT RIG COST Shift basis : <br /> <br />1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />~....~.-...,.-...r,..~~ ~..~...... <br />Machine <br />Description <br />-CAT 246 (2004) <br />-reveg equipment .. <br />Weight/unit <br />(Tons) <br />3.58 <br />20.00 <br />Ownership <br />Cost/hr/unit <br />$5.55 <br />$25.00 <br />Haul Rig <br />Cost/hr/unit <br />$88.67 <br />$88.67 <br />Fleet Size <br />(No. units) <br />1 <br />1 <br />Haul Trip <br />CosUhr/fleet <br />$94.22 <br />$113.67 <br />Return Trip <br />Cost/hr/fleet <br />$88.67 <br />$88.67 <br />DOT permit <br />CosUfleet <br />$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $207.89 $177.34 $0.00 <br />sheet 1 of 2 <br />Permit/job # :P-2008-021 <br />Abbreviation :none <br />Filename :P021-04a <br />