Laserfiche WebLink
CIRCES Cost Estimating Software <br />IPMENT MOBILIZATION / DEMOBILIZ <br />__ <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task # : 05a State :Colorado <br />Date :07/02/2008 County :Montrose <br />User : GRM Site :Atkinson Mesa <br />sheet 1 of 2 <br />PermiUjob # :P-2008-021 <br />Abbreviation :none <br />Filename :P021-05a <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :S@C011daPy f eC1a171af/0I1 1)'lOblllZatlOn <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source.: CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />_. <br />NON-ROADABLE EQUIPMENT <br />Machine WeighUunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Description (Tons) Cost/hr/unit Cost/hr/unit (No. units) Cost/hr/fleet Cost/hr/fleet Cost/fleet <br />Subtotals : $0.00 $0.00 $0.00 <br />