Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $47.52 1 $47.52 $47.52 <br />-Light Duty Pickup, 4x4, 1 T. Crew $38.57 1 $38.57 $38.57 <br />-Generic 12-18 cy, 6x4 $82.82 1 $82.82 $82.82 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $168.90 $168.90 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time Non- Total one-wa <br />t <br />l di <br />t <br /> y <br />rave <br />s <br />ance : 10.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.22 0.22 Total non-roadable mob/demob cost $1,346.28 <br />Return time (hours) = 0.22 0.22 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $75.07 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 1.44 0.44 <br /> <br />JOB TIME AND COST Total job time : 2,89 hours <br /> Total job cost : $1,421 <br />Gunnison