Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br /> sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task #: 10a State : Colorado <br />- Permit/job #:M-1978-305 <br /> <br />Date : <br />6712012008 County : Gunnison _ <br />Abbreviation :none <br />User : SSS Site :Dickerson Pit Filename :M305-10a <br />Permit or other job action : Succession Of Operators #4 <br />Task description : Transport reclamation equipment to/from site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />capacitiess pacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown st/h our : $16.63 $18.37 $22.33 <br />= <br />ost/hour : $44.38 $4613 $5007 <br />sUhour : $27.66 <br />st/hour : $0.00 $25.39 $25.39 <br />st/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D7R DS Series 11 - 7SU 35.17 $41.70 $117.55 1 $159.25 $117.55 $0.00 <br /> <br />-CAT 928G <br />12.91 <br />$15.75 <br />$88.67 <br />1 <br />$104.42 <br />$88.67 _ <br />$0.00 <br />_Reveg Equip _ 20.00 $20.00 $88.67 2 $217.34 $177.34 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $481.01 $383.56 $0.00