Laserfiche WebLink
PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br />and ensure that each work item is completed and constructed to design specifications. The <br />PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) <br />on weekdays. Inspections willl,;not be scheduled on weekend days or holidays without prior <br />approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule inspections <br />with the Project Manager so as not to delay the work. The following items must be observed and <br />approved by the PROJECT MANAGER before proceeding with additional work: <br />1. Upon completion of topsoil salvage operations; <br />2. Upon completion of ripping and debris / trash removal operations; <br />3. At the initiation of topsoil excavation operations; <br />4. Upon completion of topsoil excavation and application operations; <br />5. Upon initiation of surface roughening operations; <br />6. Upon initiation of channel construction operations; <br />7. Upon initiation of revegetation operations. <br />ADDITIONAL BID ITEMS <br />There are included on the Bid Schedule, several additional bid items. These bid items are NOT <br />GUARANTEED, and will be used only in the event that conditions change on site, and only after <br />approved by the PROJECT MANAGER. The additional bid items for this project include: <br />Task 10 Supply Topsoil <br />Please provide a price to obtain and deliver 3,225 cubic yards of topsoil or topsoil substitute to <br />the Project Area. Prior to accepting the soil, PROJECT MANAGER must be provided with the <br />following information by CONTRACTOR: <br />Soil Analysis <br />A representative analysis of the soil material must be provided. The analysis shall be completed <br />by a certified laboratory, and shall contain an analysis the following parameters: <br />Ammonia Organic Matter (%) <br />Nitrate <br />Conductance <br />Phosphorous Sodium Adsorption Ratio <br />pH <br />Potassium <br />Permits <br />A statement from the owner / operator of the soil provider verifying that the mining operation is <br />appropriately permitted by the State of Colorado, Mined Land Reclamation Board for the <br />extraction and sale of the material being provided. The statement must also verify that all other <br />necessary permits have been I obtained from the appropriate authorities. <br />I