Laserfiche WebLink
Measurement and Payment <br />Measurement and payment for this Task will be per cubic yard of topsoil supplied. The price bid <br />shall include all costs for purchasing and delivering the topsoil, including production of the soil <br />analysis and statements from the owner / operator of the source of the material. Payment for <br />this task will be made only for the unit price shown under Item 10of the Bid Schedule. Payment <br />shall be as this task is completed and approved by the PROJECT MANAGER. Task 10, Supply <br />Topsoil is NOT guaranteed. <br />Task 11 Supply Manure <br />Please provide a price to obtain, deliver, spread and work into the ground surface sixteen (16) <br />tons of manure. The manure shall be applied to the ground surface at a rate of two (2) tons per <br />acre. Once applied to the ground surface, the manure shall be thoroughly incorporated into the <br />previously ripped (Task 2, Site Preparation) ground surface. It is estimated that the manure will <br />be applied to eight (8) acres. <br />Measurement and Payment <br />Measurement and payment for this Task will be per acre of manure applied. Areas to which <br />manure has bee applied shall be measured to the nearest 0.1 acre and paid at the unit price bid <br />on the Bid Schedule Item 11. The price bid shall include all costs for purchasing, delivering and <br />applying the manure, including all labor, materials, equipment and all other items necessary for <br />application and incorporation of manure as described in these specifications. Payment for this <br />task will be made only for the unit price shown under Item 11 of the Bid Schedule. Payment shall <br />be as this task is completed and approved by the PROJECT MANAGER. Task 11, Supply <br />Manure, is NOT guaranteed. <br />12