My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-02_GENERAL DOCUMENTS - C1981016 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981016
>
1999-09-02_GENERAL DOCUMENTS - C1981016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 8:35:50 AM
Creation date
7/23/2008 12:37:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
9/2/1999
Doc Name
PKA-0-451
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of completing this backfill shall be ripped, roughened and revegetated as specified in Task 2, Site <br />Preparation, Task 4, Surface Roughening, and Task 6, Revegetation, respectively. <br />Measurement and Payment <br />There shall be no measurement for payment. Payment shall be for the lump sum price bid in Item <br />7 of the Bid Schedule. This lump sum bid will cover all costs for obtaining and installing the backfill <br />as required and specified in Standard Work Specification 2.0, ripping, roughening and <br />revegetating all disturbed lands associated with the backfill operation. Such payment shall be <br />considered full compensation for all labor, materials, equipment and all other items necessary and <br />incidental to the backfill closure as specified in the Standard Work Specifications. Payment for <br />this task will be made only for the amount bid under Item 7 of the Bid Schedule. Payment shall <br />be as this task is completed and approved by the PROJECT MANAGER. <br />TASK 8 EQUIPMENT RE=NTAL <br />Additional areas in and adjacent to the Project Area may require slope reduction, excavation <br />or erosion control work. A CAT D-4C or equivalent 80 FHP machine with operator, and a CAT <br />416B Backhoe loader or equivalent 74 fhp machine with operator, and a five (5) cubic yard <br />on/off highway end dump truck with operator shall be furnished for additional work as needed. <br />The hours outlined in Item 8 of the Bid Schedule are NOT guaranteed. All work will be <br />accomplished according to Standard Work Specification 19.0, Equipment Rental. <br />Measurement and Payment <br />Measurement and payment will be made as per Specification 19.0, Equipment Rental. <br />Payment will be made at the unit pricers established in Item 8 of the Bid Schedule. The hours <br />outlined in Item 9 of the Bid Schedule are NOT guaranteed. <br />TASK 9 POST CONSTRUCTION SEDIMENT CONTROL <br />Silt fence may be placed at various locations to minimize the transportation of sediment from <br />the facility. Placement of silt fencing, if required, may occur concurrently with, or immediately <br />upon completion of topsoil application operations. Up to 1,500 feet of silt fence may be <br />installed during completion of this project. Silt fence will be Mirafi Prefabricated Silt Fence <br />with Posts, or approved equivalent. <br />Silt fencing will be placed horizontally on slopes so that it is perpendicular to the fall of the <br />slope. If two lengths of silt fence are to be placed in a non-continuous manner, one end shall <br />overlap the other by five feet (6) (Figure 2, Typical Silt Fence). Silt fence will be installed as <br />per manufacturers specifications. <br />Measurement and Payment <br />Silt fence will be measured to the nearest linear foot. Payment for this task will be paid for at <br />prices established in Item 9 of the Bid Schedule per linear foot installed. Installation of 1,500 <br />feet of silt fence IS NOT guaranteed. Such payment shall be considered full compensation for <br />all labor, materials, equipment and all other items necessary and incidental to the furnishing <br />and placement of the silt fences as directed and described in the specifications. Payment will <br />be as this task is completed and approved by the PROJECT MANAGER. Payment for this <br />task will be made only for the unit price shown under Item 9 of the Bid Schedule. <br />10
The URL can be used to link to this page
Your browser does not support the video tag.