My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-02_GENERAL DOCUMENTS - C1981016 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981016
>
1999-09-02_GENERAL DOCUMENTS - C1981016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 8:35:50 AM
Creation date
7/23/2008 12:37:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Date
9/2/1999
Doc Name
PKA-0-451
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III <br />PROJECT WORK DESCRIPTION <br />The goal of this Project is to improve the quality of the vegetative cover at this previously <br />reclaimed coal mine. Previous ;reclamation efforts focused on revegetating earthen materials <br />without the benefit of topsoil. In l'order to improve the quality of the vegetative cover, the existing <br />ground surface will be ripped, topsoil will be excavated from a nearby area and distributed, a <br />small drainage channel will be II constructed and all disturbed areas will be revegetated. An <br />abandoned mine opening located near the work area will be backfilled as well. <br />NOTE that volumes, distancesli and areas stated in this document are ESTIMATIONS ONLY. <br />CONTRACTORS are responsible for verifying all estimations prior to bid submittal. <br />WORK TASKS <br />The Tasks to be accomplished during this Project include: <br />Task 1: Mobilization, Demobilization <br />Task 2: Surface Preparation <br />Task 3: Topsoil Application <br />Task 4: Surface (Roughening <br />Task 5: Channel Construction <br /> <br />Task 6: <br />Revegetation <br />11 <br />Task 7: Mine Opening Backfill <br />Task 8: Equipment Rental <br />Task 9: Post Construction Sediment Control <br />Task 10: Supply Topsoil <br />Task 11: Supply Manure <br />TASK 1 MOBILIZATION, DEMOBILIZATION <br />This Task shall comply with Standard Work Specification 1.0, Mobilization / Demobilization. <br />Measurement and Payment i' <br />There will be no measurementjlfor payment. Payment for this task will be reflected in a lump <br />sum bid under Item 1 on the Bid Schedule. This lump sum bid will cover all costs for <br />Mobilization and Demobilization. Payment shall be made as described in Specification 1.0, <br />Mobilization / Demobilization. <br />TASK 2 SURFACE PREPARATION <br />In order to prepare the site for topsoil application, existing topsoil, where present, will be salvaged. <br />The entire area will be deeply ripped. Any trash encountered, metallic or otherwise, will be <br />salvaged and removed from the site. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.