Laserfiche WebLink
October Ore Pile Reclamation Rule 8: ERP <br />110(d) Limited Impact Permit Application <br />Nuvemco LLC October Ore Pile Reclamation <br />6.5 Geotechnical Stability Exhibit <br />6.5 (1) Geologic Hazards <br />NA. There are no impoundments, slopes, embankments, highwalls, or waste <br />piles in the October Ore Pile Reclamation site to be impacted by geologic hazards or <br />reclamation activities. <br />6.5 (2) Engineering Stability Analyses <br />NA. There are no reclaimed slopes of greater than six percent, or highwalls, <br />waste piles, embankments, or ore leach facilities in the October Ore Pile Reclamation <br />site which require engineering stability analyses. <br />6.5 (3) Off-site Impacts <br />NA. There are no impoundments, slopes, embankments, highwalls, waste piles, <br />or earthen constructed facilities off-site to be impacted by mining or reclamation activities <br />in the October Ore Pile Reclamation site. <br />6.5 (4) Blasting <br />NA. There will be no blasting activities associated with the October Ore Pile <br />Reclamation. <br />56