My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-14_PERMIT FILE - M2008050
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008050
>
2008-07-14_PERMIT FILE - M2008050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:39 PM
Creation date
7/18/2008 10:43:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008050
IBM Index Class Name
PERMIT FILE
Doc Date
7/14/2008
Doc Name
New 110d Application
From
Nuvemco, LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October Ore Pile Reclamation <br />110(d) Limited Impact Permit Application <br />Nuvemco LLC October Ore Pile Reclamation <br />Table 6-1 Site Soil Characteristics <br />Rule 8: ERP <br />Soil Mapping Unit Map <br />Symbol Texture pH Electrical <br />Conductivity SAR <br />Rock outcrop-Sedgran, 6 unweathered bedrock, not not rated not <br />40-99% slopes, very fine sandy loam, rated rated <br />stony channe loam fine sand <br />Bodot-Sili-Rock outcrop 66 clay loam, clay, and 8.2 0.8 7.8 <br />complex, 5-25% slopes, gravelly clay loam mmhos/cm <br />very boulde <br />6.4.20 (18) Wildlife Protection <br />6.4.20 (18) (a) An official letter from the Colorado Department of Wildlife [Section 6.3.2 <br />(d)] verifies that no critical or important wildlife habitats or wildlife species will be <br />impacted by the reclamation of the October Ore Pile. No wildlife habitat will be affected <br />negatively by removal of the ore pile. <br />6.4.20 (18) (b) The proposed removal of the ore pile will reduce the risk of wildlife <br />coming into contact with toxic materials or areas of acid mine drainage. <br />6.4.20 (19) Disposal of Tailings and Sludges in Mine Workings <br />Nuvemco will comply with the provisions of Subsection 3.1.7 in removing the October <br />Ore Pile and reclaiming the ore pile site. <br />55
The URL can be used to link to this page
Your browser does not support the video tag.