Laserfiche WebLink
B. Stockpile in an area designated by the Owner. Construct stockpile with maximum <br />3H:1 V slopes and in a manner that the topsoil receives the minimum amount of <br />compactive effort from the haulage equipment. <br />C. Topsoil stripping shall include removal of all organic sod, grass, topsoil, and roots. <br />D. All stripping shall be completed prior to the start of any grading operations. <br />***END OF SECTION*** <br />• <br />• <br />Revision A 02110-2 January 2008 <br />.L\0 C745%4 \OREPADLINERDES iWANMS PH-nCHSPPCST21 IMrECLEAR AND STMP.DOC