My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-08-23_GENERAL DOCUMENTS - C1981016 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981016
>
2000-08-23_GENERAL DOCUMENTS - C1981016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2021 6:55:53 PM
Creation date
7/16/2008 4:05:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
8/23/2000
Doc Name
PKA-1-476
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the CONTRACTOR shall be liable for any cost of procuring the work which exceeds the <br /> amount of his bid, and the bid guarantee shall be available toward offsetting such <br /> difference. <br /> List of Equipment Offered. The List of Equipment Offered form must be returned with <br /> each bid. All equipment to be used on the project must be listed. The CONTRACTOR <br /> must own, have a current lease for the equipment intended to be used to perform the <br /> work, or must furnish a statement of arrangements to rent, or otherwise procure, <br /> adequate equipment to perform the work. Inclusion of a piece of equipment:on the List <br /> of Equipment Offered represents a commitment to devote that piece of equipment to the <br /> project work for the entire duration of the project. If several contractors propose to join <br /> together to perform the work under this purchase order contract, equipment owned or <br /> controlled by each should be listed and the owner identified. A purchase order contract <br /> will not be awarded to a bidder who in the opinion of the OWNER (a) does riot have <br /> adequate equipment, or (b) does not have firm and satisfactory arrangements to obtain <br /> adequate equipment to perform the work described in the Invitation and Bid. <br /> BID AWARD <br /> Award will be made with reasonable promptness, by written notice to the low responsive <br /> and responsible bidder whose bid meets the requirements and criteria set forth in the <br /> Invitation for bid. These criteria will include, but not be limited to the lowest GRAND <br /> TOTAL PRICE, corrected if necessary for errors in price extension and/or addition, on <br /> the Bidder's equipment if a List of Equipment Offered is required with the bid, and <br /> capability to meet the performance time requirements. The GRAND TOTAL. PRICE will <br /> be used for comparing bids only. If this bid exceeds such amount, the right is reserved <br /> to reject all bids. <br /> GENERAL BID SPECIFICATIONS <br /> The Colorado Inactive Mine Reclamation Program General Bid Specifications 1996, <br /> which include General Conditions, Standard Work Specifications, and Standard <br /> Drawings and Figures are intended to complement these Special Conditions. The <br /> Special Conditions combined with the General Bid Specifications 1996 form the <br /> complete Invitation and Bid document. Please refer to the Standard Work Specifications <br /> for all applicable types of work required in the Special Conditions. The General <br /> Conditions apply to all work covered in the Special Conditions. Copies of the General <br /> Bid Specifications are available at the Pre-Bid Meeting or from the Division of Minerals <br /> and Geology (DMG), 1313 Sherman Street, Room 215, Denver, Colorado 80203 <br /> (303) 866-3567. <br /> PROJECT DATES <br /> The project is scheduled for construction between October 10, 2000 and October 27, <br /> 2000. This includes mobilization and demobilization time. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is eighteen (18) calendar days after <br /> receipt of the Notice to Proceed. This includes mobilization and demobilization time. <br /> LIQUIDATED DAMAGES <br /> The liquidated damages for this project will be $400.00 per day. Please see General <br /> Conditions, Articles 34, 35 and 40. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.