My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-08-23_GENERAL DOCUMENTS - C1981016 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981016
>
2000-08-23_GENERAL DOCUMENTS - C1981016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2021 6:55:53 PM
Creation date
7/16/2008 4:05:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
8/23/2000
Doc Name
PKA-1-476
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Measurement and Payment <br /> Constructed drainages shall be measured to the nearest linear foot. Measurement for <br /> payment will consist of physically measuring the length of each drainage. Payment for <br /> this task will be paid for at prices established in Item 5 of the Bid Schedule per linear foot <br /> constructed. Such payment shall be considered full compensation for all labor, <br /> materials, equipment and all other items necessary and incidental to the drainage ditch <br /> construction to the specifications. Payment will be as this task is completed and <br /> approved by the PROJECT MANAGER. Payment for this task will be made only for the <br /> unit prices shown under Item 5 of the Bid Schedule. <br /> TASK 6 REVEGETATION <br /> All areas subject to revegetation shall be scarified as described in Task 4, Incorporate <br /> Materials, prior to beginning revegetation. Certified weed free straw mulch was applied to <br /> the soil during completion of Task 4. Additional light mulching is required during <br /> performance of Task 6, Revegetation. <br /> All areas disturbed during reclamation work and any other areas specified in these <br /> Special Conditions will be revegetated according to the Revegetation Specifications in <br /> the General Bid Specifications. Commercial fertilizer is required for this project, and <br /> will be supplied by CONTRACTOR. Seed will be supplied by the OWNER. <br /> All areas disturbed during reclamation work and any other areas specified in these <br /> Special Conditions will be revegetated, according to the Revegetation Specifications in <br /> the General Bid Specifications Section 20.0, except as modified by these Special <br /> Conditions. <br /> In addition to the revegetation specifications outlined in Section 20.0 attached, the <br /> following requirements will be adhered to: <br /> Seed <br /> Seed will be provided by the OWNER. CONTRACTOR must give the PROJECT <br /> MANAGER at least ten (10) working days notice of the acreage to be seeded, so that <br /> the proper amount of seed is delivered. Hand written acreage calculations are <br /> acceptable. <br /> Fertilizers <br /> Commercial fertilizer is required for this project. Fertilizer shall be provided by <br /> CONTRACTOR, and shall conform to Section 20.2 (commercial fertilizer) of the <br /> Revegetation Specifications. <br /> Seedbed Preparation <br /> Seedbed preparation was accomplished during performance of Task 4, Incorporate <br /> Materials. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.