Laserfiche WebLink
- Scarify the surface by using a trackhoe bucket or similar piece of equipment <br /> to create numerous gouges in the cut slope. Gouge or pull the ground <br /> surface and mulch toward the machine in a manner such that no less than <br /> twelve inches (12") of vertical relief is created. These gouges shall be <br /> sufficiently close,so that no more than eighteen inches (18") exists between <br /> the crest of one gouge and the crest of an adjacent gouge, in any direction. <br /> The scarified surface will be revegetated in accordance with these specifications (Task <br /> 6, Revegetation). <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a <br /> lump sum bid under Item 4 on the Bid Schedule. This lump sum bid will cover all costs <br /> for labor, equipment and materials necessary and incidental to fulfilling this ;specification, <br /> including distribution of the reduced slash, stockpiled topsoil and any other organic <br /> materials available, ripping of the Project Area, and severely roughening the Project <br /> area, including the acquisition and distribution of mulch materials. Payment will be made <br /> only for the price bid in Item 4 of the Bid Schedule, and as work is completed and <br /> approved by PROJECT MANAGER. <br /> TASK 5 DRAINAGE CONSTRUCTION <br /> A small channel will be constructed in order to convey flow from the south sidle of the <br /> asphalt access road to an existing drainage channel. The constructed channel will be <br /> approximately fifty feet (50') in length. PROJECT MANAGER will stake and flag the <br /> location of the channel in the field prior to construction beginning. <br /> The new channel segment will be constructed to the following specifications: <br /> Upon completion, this channel will be trapezoidal in shape, the base being no less than <br /> five feet(6) in width and the side slopes being no steeper than 2 H : 1 V. The width of the <br /> ditch as measured from crest to crest will be no less than thirteen feet (13'). The total <br /> depth of the ditch as measured from the base to the crest will be no less than two feet <br /> (2.0'). The base of the channel must be constructed in a manner so that upon completion, <br /> it is level as viewed in cross section (ie: as viewed perpendicular to the direction of flow). <br /> Upon completion of excavation, the base and sides of the channel shall be lightly ripped <br /> using the teeth of a track hoe or back hoe. The base and sides will then be fertilized and <br /> seeded as described in Task 6, Revegetation. <br /> Large rock encountered during excavation shall be used as rip rap upon completion of <br /> excavation. The large rock separated from the slash during completion of Task 2 Slash <br /> Reduction, shall also be used as rip rap material. These rock materials shall be placed <br /> within the channel footprint so that the base of the channel and the sides are covered by <br /> the rock in a random pattern. <br /> 9 <br /> i <br />