Laserfiche WebLink
Agency or organization name :DBMS <br />Permit or other job action :Initial Reclamation Liabilty Estimate <br />Task description :spread available topsoil over pocking <br />t ; <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 318C L <br />Horsepower: 125 <br />Weight (MT) : 19.64 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost hour : $90.01 <br />volume : 672 CCY factor : 1.125 volume : 756 LCY <br />• <br />Source of estimated volume :reclamtion plans <br />Source of estimated swell factor : na <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded, dump bucket, swing empty} <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.93 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 1.05 Moist loam or sandy clay (100% - 110%) _, <br />Adjusted bucket capacity : 0.98 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,800 feet Altitude adjustment : 1.00 ~ (Cat HB)_ <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Nei job correction : 0.83 multiplier <br />