My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-11_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-07-11_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:32 PM
Creation date
7/16/2008 8:33:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
7/11/2008
Doc Name
Exhibit L thru V (volume 1)
From
Energy Fuels Resources Corp.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :DBMS <br />Permit or other job action :lnitia! Reclamation Liabilty Estimate <br />Task description :cut and fill, establish water bars on access road <br />.: . <br />:. , <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DSR Series 11 - 8U (2005) Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $57.40 NA <br />Operating cost/hour : $77.43 100 <br />Ripper op. cosUhour : $1.68 25 <br />Operator cosUhour : _$32.78 NA <br />Total unit cost/hour : $169.28 Total fleet cosUhour : $169.28 <br />. MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,597 BCY factor : 1.430 volume : 2,284 LCY <br />Source of estimated volume :reclamation plans <br />Source of estimated swell factor :na <br /> <br />HOURLY PR .: <br /> <br />ODUCTION <br />., . <br />Job Condition Correction Factors . _. <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet <br />Unadjusted hourly production : 931.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />12.00 % (neg) <br />6, 800 feet <br />Material weight : 3, 300 1bs/LCY <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth <br />• <br />JOB TIME AND COST <br />Fleet size <br />Dozers) <br />Material consistency : 0.90 (Cat NB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift/da~ <br />Spoil pile : 0.80 (fnd-r~ <br />Push gradient : 1.27 (Cat HB) <br />Altitude : 1.00 (Cat NB) <br />Material weight : 0.70 (Cat HB) <br />Blade type : 1.00 (S/SU/UJ <br />Net correction : 0.40 <br />Adjusted unit production : 368.77 LCY/hr <br />Adjusted fleet production : ~ 368.77 LCY/hr <br />Total job time : 6.19 Hours <br />Unit cost : $0.459 /LCY Total job cost : $1,048 <br />
The URL can be used to link to this page
Your browser does not support the video tag.