Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action :Initial Reclamation Liability Estimate <br />Task description :pock 0.99 acres of slopes <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 318C L <br />Horsepower: 125 <br />Weight (MT) : 19.64 <br />Cost Breakdown : ~ Utilization <br />Ownership cost/hour : $23.16 NA Shift basis : 1 per day <br />Operating cosUhour : $33.89 100 Data source : (CRG) <br />Operator costlhour : $32.96 ( NA <br />Total unit costlhour : $90.01 <br />: Total fleet cosUhour : $90.01 <br />. <br />.. <br />__ .. <br /> <br />MATERIAL QUANTITIES <br /> <br />., <br /> <br /> <br />: <br />Initial Swell Loose <br />volume : 3,750 LGY factor: NA volume : 3,750 LCY <br />• <br />Source of estimated volume :reclamation plans <br />Source of estimated swell factor :NA <br /> <br />- ,.. ,. <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.31 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.93 _LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.68 Rock -Well blasted (60% - 75%) <br /> <br />Adjusted bucket capacity : 0.63 LCY __ __ <br />Job Condition Correction Factors Source <br />Site altitude : 6,800 feet Altitude adjustment : 1.00 _ (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shifbday)_ <br />Net job correction : 0.83 multiplier <br />