Laserfiche WebLink
• <br />L <br />• <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION !DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :DBMS <br />Task # : M62 State :Colorado Permit/job # : M-2007-044 <br />Date :02/05/2008 County :Mesa Abbreviation :none <br />User : GRM Site :Whirlwind Mine Filename :M044-M82 <br />Permit or other job action :Initial Reclamation Liability Estimate <br />Task description :Secondary Seeding Mobilization <br />,,..:. <br />_. _... . <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, SOT, and 100T) <br />Cost Breakdown <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />_ <br />_ Operating cosUhour : $44.38 $46.13 $50.07 <br />_ Operator cosUhour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Costlhour : $88.67 $117.55 $125.45 <br />,... <br />___ _~. <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig I <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhrlfleet Return Trip <br />CosUhrlfleet DOT permit <br />Cost/fleet <br /> <br /> <br /> <br />-CAT 246 (2004) 3.58 $5.55 $88.67 1 $94.22 $88.67 $0.00 <br />_ <br />-reveg equipment ~ 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />-- -- <br />- - - - - - <br />- -- . -- - <br />- - I - - <br /> <br /> <br /> <br />Subtotals : $207.89 $177.34 $0.00 <br />