Laserfiche WebLink
;. <br />,.: ;: ;. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Costlhr/fleet I Return Trip <br />Costlhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $55.22 1 $55.22 $55.22 <br />-Light Duty Pickup, 4x4, 3/4 T. $33.47 2 $66.94 $66.94 <br />-Water Tanker, 3, 500 Gal. $57.99 1 $57.99 $57.99 <br /> <br /> <br /> <br /> <br /> <br />- -- - <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $180.15 $180.15 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cvcle Time : Non- <br />• Roadable <br /> Equipment <br />Haul lime (hours) = 1.50 <br />Return time (hours) = 1.50 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 4.00 <br /> <br />JOB TIME AND COST _. . <br />Nearest major city or town within project area region : Grand Junction <br /> Total one-way travel distance : 60.0 miles <br />Roadable Average travel speed : 40.0 mph <br />quipment <br />_1.50 Total non-roadable mob/demob cost' : $4,443.17 <br />1.50 ' iwo round trips with haul rig <br />_ NA Total roadable mob/demob cost '"' : $540.45 <br />NA "' one round trip, no haul rig <br />3.00 <br /> <br /> 1 ,. <br />Total 'ob time : <br />8.00 hours <br /> Total job cost : $4, 984 <br />• <br />