Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :DRMS <br />Task # : MB1 Siate :Colorado PermiUjob # :M-2007-044 <br />Date :02/05/2008 County :Mesa Abbreviation :none <br />User : GRM Site :Whirlwind Mine Filename :M044-M81 <br />Permit or other job action : Initial Reclamation Liability Estimate <br />Task description : //7%tlal MOblllZatlOll to Slte <br /> •{ <br />_.,. <br /> <br />EQUIPMENT TRANSPORT RIG COST <br />,:,. ... <br />:. <br />Shift basis : 1 per day <br /> <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />. ... <br />:.. -:. <br />NON-ROADABLE EQUIPMENT <br />• _ <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(Na. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />CosUhr/fleet DOT permit <br />Cost/fleet <br />_Cat D8R Series ll - 8U (200• 53.17 $50.59 $125.45 1 $176.04 $125.45 $0.00 <br />-Cat 318C L 21.66 $23.16 $88.67 1 $111.83 $88.67 $0.00 <br />-CAT938G (2003) 14.45 $16.13 $88.67 1 $104.80 $88.67 $0.00 <br />-CAT 246 (2004) 3.58 $5.55 $88.67 1 $94.22 $88.67 $0.00 <br /> <br />-reveg equipment <br />10.00 <br />$25.00 <br />$88.67 <br />1 <br />$113.67 <br />$88.67 _ <br />~ $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $600.56 $480.13 $0.00 <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator costlhour : $27.66 $27.66 $27.66 <br />Helper cosUhour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />