Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />• <br />Machine ~ Total <br />Description Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/Fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $55.22 1 $55.22 $55.22 <br />-Light Duty Pickup, 4x4, 3/4 T. $33.47 1 $33.47 $33.47 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $88.69 $88.69 <br />:.:: <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul lime (hours) = 1.50 1.50 Total non-roadable mob/demob cost <br />Return time (hours) = 1.50 1.50 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "' <br />Unloading time (hours) = 0.50 NA •~ one round trip, no haul rig <br />Subtotals = 4.00 3.00 <br />Grand Junction <br />60.0 mites <br />40.0 mph <br />$1, 571.48 <br />$266.07 <br />JOB 71ME AND COST Total job time : 8.00 hours <br />Total job cost : $7,$$$ <br /> <br />