My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-02-23_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-02-23_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:06:27 AM
Creation date
7/11/2008 2:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/23/1995
Doc Name
PKA-9-440
From
DRMS
To
DRMS
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Risers on the primary spillways of ponds 22-P5, 22-P6 and 22-P10 shall be cut so that twelve <br /> inches of vertical pipe remains. <br /> Measurement and Payment <br /> There will be no measurement for Task #11. Payment for Task#11 will be reflected under <br /> Item #11 on the Bid Schedule. <br /> Task 12 - Trailer Removal <br /> Work Description <br /> The white, 40-foot house trailer and all trash associated with the trailer site located in the <br /> south central portion of Section 15 shall be removed and disposed of in an approved landfill. <br /> Measurement and Payment <br /> .There will be no measurement for Task #12. Payment for Task #12 will be reflected under <br /> Item #12 on the Bid Schedule. <br /> Task 13 - Revegetation <br /> Work Description <br /> Upon completion of the final grading, all areas in Sections 15 and 22, disturbed during <br /> reclamation work, and any other areas specified in these Special Conditions will be <br /> revegetated according to 20.0'Revegetation, attached. Disturbed land will be fertilized, <br /> broadcast seeded, mulched and crimped. Commercial fertilizer is required for this project. <br /> Seed will be supplied by the OWNER. The Pinon-Juniper seed mix will be used on all <br /> areas. <br /> The following requirements apply: <br /> ■ The awarded CONTRACTOR will notify the PROJECT MANAGER two (2)weeks <br /> in advance of his notice to proceed with the revegetation phase of the project. <br /> ■ The OWNER will supply all the seed for the revegetation work. <br /> ■ The CONTRACTOR will supply the fertilizer, mulch, equipment for fertilizer <br /> application, seeding, mulching and crimping on any and all of these procedures which <br /> will be used. <br /> Measurement and Payment <br /> The revegetated area will be measured to the nearest 0.1 acreage. payment,for Task 11 will <br /> be based on the unit price bid under Item 13 and on the Bid Schedule and the actual <br /> number of acres revegetated. This unit price cost will cover payment of all costs associated <br /> with each component of the revegetation project. Any or all incidental costs incurred by the <br /> 12 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.