My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-02-23_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-02-23_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:06:27 AM
Creation date
7/11/2008 2:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/23/1995
Doc Name
PKA-9-440
From
DRMS
To
DRMS
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There will be no measurement for Task #7. Payment for Task #7 will be reflected in a <br /> lump sum bid under Item #8 on the Bid Schedule. <br /> Task #8 - Spillway Removal Pond 22-P4. <br /> Scope of Work and Work Description <br /> The emergency spillway shall be removed from Pond 22-P4, allowing free flow around the <br /> embankment. Care must be taken to not disturb portions of the embankment where ' <br /> vegetation is well established. Additionally a 10-foot section of Ditch 22-1310, shall be <br /> removed, and flow directed into Pond 22-P4. <br /> Measurement and Payment <br /> There will be no measurement for Task #8. Payment for Task #8 will be reflected in a <br /> lump sum bid under Item #8 on the Bid Schedule. <br /> Task 9 - Ditch and Gully Repair <br /> Work Description <br /> Approximately 100 feet of the failed ditch to Pond 15-P shall be removed (filled) and <br /> graded to original contour. The large adjacent gully re ulting from this failure shall be 1 <br /> repaired by creating a gentle swale 3 feet deep contaimn riprap. The riprap material must <br /> consist of durable irregular rock having a minimum D-50 of 6 inches and a D-max of 9 ' <br /> inches. Riprap will have to be imported (s@o P-avvie- 434 <br /> There will be no measurement for Task #9. Payment for Task #9 will be reflected in a <br /> lump sum under item #9 on the Bid Schedule. <br /> Task 10 - Spillway Repair <br /> Work Description <br /> The emergency spillways of Ponds 15-P11 and 15-P12 shall be lowered one and one-half <br /> (1 1/2) feet to accommodate a total of 3 feet of riprap. Riprap material must consist of <br /> durable irregular rock having a minimum D-50 of 6 inches and a D-max of 9 inches. Riprap <br /> will have to be imported (see Drawing #3). <br /> Measurement and Payment <br /> There will be no measurement for Task #10. Payment for Task#10 will be reflected under <br /> Item #10 on the Bid Schedule. <br /> Task 11 - Riser Modification <br /> Work Description <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.