My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-02-23_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-02-23_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:06:27 AM
Creation date
7/11/2008 2:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/23/1995
Doc Name
PKA-9-440
From
DRMS
To
DRMS
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR shall be reflected in each Bid Item of shall be paid at the <br /> CONTRACTOR'S expense. <br /> - -SI <br /> *** ARE THE SE TWO ITEM-S ADDITIVE ALTERNATES OR_ADDITIONALS??? *** <br /> Task #14 - Non-Guaranteed Reforestation <br /> Two areas north of Pond 15-P20 and south of Pond 22-P17 will require the planting of <br /> native trees to help stabilize steep slopes. <br /> Work Description <br /> Rocky Mountain Juniper and Pinon Pine tree "tbelings" shall be planted using a twenty to <br /> thirty foot center random pattern. Two areas will be covered namely: <br /> An area 100 feet by 200 feet, lying directly west of the ditch to Pond 15-P20 will require 75 <br /> trees, (see Map #5). <br /> An area south of Pond 22-P17 will require one hundred seventy five (175) trees in an area <br /> 100 feet by 500 feet, (see Map #5). <br /> Fertilizer tablet shall be incorporated into the soil for each tubling, in addition to <br /> polyacrylaminide, which shall be incorporated into the soil for each tubling at the rate <br /> recommended by the CSFS. <br /> Tublings will be-provided-by;the Division of Minerals and Geology. Specifications from <br /> PK?? Fertilizer tablets provided by Contractor?? What else <br /> There will be no measurement for Task #14. Payment for Task #14 will be reflected in a <br /> lump sum bid under Item #6 on the Bid Schedule. <br /> Task # - Non-Guaranteed Pond 15-P1 Clean-out <br /> Sedime t deltas in Pond 15-P1 shall b remo d using a dragline. re lting material, <br /> clay, sil and fine sand shall be dispos d of by inc rporating into the r clamat'on of adjacent <br /> Pond 1 -P10. <br /> Measur ment and Pa ment <br /> There w1l be no measurement fo Task #15. Paym nt for Task#15 will be re ected under <br /> Item #1 5 on the Bid Schedule. <br /> PROJE T OBSERVATION <br /> The PR ECT MANAGE will be at the project ite perio cally to monitor construction <br /> activities nd ensure th each work item is omplet and constructed to design <br /> specificati s. The PRO ECT MANAGER will be availa a during regular business hours <br /> (8:00 A.M. 5:00 P. . on weekdays. Inspections `11 of be scheduled on weekend days <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.