My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-03-23_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-03-23_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 2:03:13 PM
Creation date
7/11/2008 2:27:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/23/1995
Doc Name
PKA-9-440
From
DRMS
To
All Bidders
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riprap material must consist of durable irregular rock having a minimum D-50 of 6 inches <br /> and a D-Max of 18 inches installed in accordance with drawing number 3. <br /> The riprap shall extend 10 feet down the outslope of the spillway. <br /> The Project Manager will authorize the use of large non-specification riprap boulders <br /> currently existing on this spillway for placement on the outslope area of the spillway to <br /> augment the specification rock at this location. <br /> 9. TASK 13-REVEGETATION. The Work Description is changed and clarified to include the <br /> following: <br /> As clarification, all areas affected by tasks 1 through 12 will be reseeded in accordance <br /> with the attached revegetation specifications for broadcast seeding. Please refer to the <br /> seedbed preparation, broadcast seeding, mulching and crimping sections of the attached <br /> revegetation specifications <br /> As clarification, after seed is broadcast over the site, the seed will be raked or lightly <br /> harrowed into the upper 1/4 to 1/2 inch of the surface. <br /> The fertilizer has been eliminated from this project. <br /> As clarification, all seeded areas will be mulched and crimped in accordance with the <br /> revegetation specifications. <br /> The Measurement and Payment description is changed to include the following: <br /> The revegetated area will not be measured to the nearest .1 acreage as payment is for <br /> the job price. <br /> Eliminate the second sentence which reads "Payment for Task 13 will be based on the <br /> unit price bid under item 13 and on the Bid Schedule and the actual number of acres <br /> revegetated." <br /> The job price cost will cover payment of all costs associated with each component of the <br /> revegetation project. <br /> 10. TASK 14-REFORESTATION. One area above Pond and ditch 15-P20 will require the <br /> planting of native trees to help stabilize steep slopes. The Work Description is changed <br /> to include the following: <br /> A total of 250 tublings will be planted above pond and ditch 15-P20. <br /> Tublings will not be planted south of pond 22-P17. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.