Laserfiche WebLink
Riprap material must consist of durable irregular rock having a minimum D-50 of 6 inches <br /> and a D-Max of 18 inches installed in accordance with drawing number 3. <br /> The riprap shall extend 10 feet down the outslope of the spillway. <br /> The Project Manager will authorize the use of large non-specification riprap boulders <br /> currently existing on this spillway for placement on the outslope area of the spillway to <br /> augment the specification rock at this location. <br /> 9. TASK 13-REVEGETATION. The Work Description is changed and clarified to include the <br /> following: <br /> As clarification, all areas affected by tasks 1 through 12 will be reseeded in accordance <br /> with the attached revegetation specifications for broadcast seeding. Please refer to the <br /> seedbed preparation, broadcast seeding, mulching and crimping sections of the attached <br /> revegetation specifications <br /> As clarification, after seed is broadcast over the site, the seed will be raked or lightly <br /> harrowed into the upper 1/4 to 1/2 inch of the surface. <br /> The fertilizer has been eliminated from this project. <br /> As clarification, all seeded areas will be mulched and crimped in accordance with the <br /> revegetation specifications. <br /> The Measurement and Payment description is changed to include the following: <br /> The revegetated area will not be measured to the nearest .1 acreage as payment is for <br /> the job price. <br /> Eliminate the second sentence which reads "Payment for Task 13 will be based on the <br /> unit price bid under item 13 and on the Bid Schedule and the actual number of acres <br /> revegetated." <br /> The job price cost will cover payment of all costs associated with each component of the <br /> revegetation project. <br /> 10. TASK 14-REFORESTATION. One area above Pond and ditch 15-P20 will require the <br /> planting of native trees to help stabilize steep slopes. The Work Description is changed <br /> to include the following: <br /> A total of 250 tublings will be planted above pond and ditch 15-P20. <br /> Tublings will not be planted south of pond 22-P17. <br /> 4 <br />