My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981048 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
_GENERAL DOCUMENTS - C1981048 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 3:04:50 PM
Creation date
7/11/2008 2:25:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately 10 feet wide and will extend deep enough vertically so that runoff will exit the <br /> ditch at that point. <br /> Measurement and Payment <br /> There will be no measurement for payment for Task# 9. Payment for Task#9 will be reflected <br /> in a lump sum bid under Item 9 on the Bid Schedule. <br /> Task 10-Access Road Repair Work(North-South Section) <br /> There are four erosion gullies on the outslope of the north-south section of the Section 22 <br /> access road (See Map 6). The gullies will be repaired as follows: <br /> Gully No. 1 exists along the outside edge of the access road across from Pond 22-P5. The <br /> berm and gully will be backfilled and repaired. Gully No. 2 is across from Pond 22-P6. At this <br /> point, a 7 foot long section of the road needs to be filled in and leveled and the berm will be <br /> repaired. Gully No. 3 is located two hundred feet south of Pond 22-P6. Runoff has cut a 5 foot <br /> wide gully in the road berm. The gully will be filled in and the berm repaired. Gully No. 4 is <br /> located about 200 feet northeast of Pond 22-P7. The gully will be filled and the berm repaired. <br /> Measurement and Payment <br /> There will be no measurement for payment for Task#10. Payment for Task#10 will be <br /> reflected in a lump sum bid under Item 10 on the Bid Schedule. <br /> Task 11- Installation of Road Dips in the North-South Access Road <br /> Eight road dips will be installed in the north-south access road at locations marked by the <br /> Project Manager(See Map 6). The road dips will be constructed pursuant to Figure 1. <br /> Measurement and Payment <br /> There will be no measurement for payment for Task# 11. Payment for Task#11 will be <br /> reflected in a lump sum bid under Item 11 on the Bid Schedule. <br /> Task 12- Remove Old Culvert <br /> Two steel culverts are partially buried in a bank near the end of the north south access road. <br /> These culverts will be removed for use elsewhere as directed by the Project Manager. <br /> Measurement and Payment <br /> There will be no measurement for payment for Task# 12. Payment for Task#12 will be <br /> reflected in a lump sum bid under Item 12 on the Bid Schedule. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.