Task 13- Rill and Gully Revegetation—Section 22 <br /> The steep, north-facing reclaimed slope at the west end of the mine, immediately south of the <br /> Canyon Del Agua and located in the NW/4 of the NW/4 of Section 22 (see map), shall be <br /> reseeded according to specifications in 20.0 Revegetation. <br /> Measurement and Payment <br /> There will be no measurement for payment for Task#13. Payment for Task#13 will be <br /> reflected in a lump sum bid under Item 13 on the Bid Schedule. <br /> Task 14- Revegetation and Weed Control, Section 15 <br /> Approximately 6 acres of steep slope north of the County Road at the west end of the mine <br /> shall be seeded, mulched and fertilized according to specifications in 20.0 Revegetation. <br /> Several thistle patches north of the County Road shall be sprayed by a certified pesticide <br /> applicator as directed by the Project Manager. <br /> Measurement and Payment <br /> There will be no measurement for payment for Task#14. Payment for Task#14 will be <br /> reflected in a lump sum bid under Item 14 on the Bid Schedule. <br /> Task 15 Revegetation <br /> All areas in Sections 15 and 22 disturbed during reclamation work and any other areas <br /> specified in these Special Conditions will be revegetated according to Revegetation <br /> Specifications, Section 20.0, in the General Bid Specifications. Commercial fertilizer is <br /> required for this project. Seed will be supplied by the OWNER. The Pinion-Juniper seed mix <br /> will be drilled on all areas. If directed by the Project Manager, steep sloped areas will be <br /> broadcast. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design specifications. <br /> The PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 <br /> P.M.) on weekdays. Inspections will not be scheduled on weekend days or holidays without <br /> prior approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule <br /> inspections with the Project Manager so as not to delay the work. The following items must be <br /> observed and approved by the PROJECT MANAGER before proceeding with additional work: <br /> 1. Checkdam keys <br /> 2. Seeding <br /> 3. Placement of Geotextile <br /> 12 <br />