My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-04-13_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-04-13_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:49:59 PM
Creation date
7/11/2008 2:20:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/13/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 MOBILIZATION/DEMOBILIZATION <br />1.1 DESCRIPTION <br />This specification covers the CONTRACTOR'S operations for: <br />a. Payment of premiums for bonds and insurance acquired specifically for the <br />construction of this project, including premiums for performance and payment bonds; <br />b. Movement of personnel, equipment, operation supplies, and incidentals to the project <br />site; <br />c. Establishment of office, buildings, plants, and other necessary facilities at the project <br />site; <br />d. Preparatory work at the construction site; and, <br />e. Demobilization of CONTRACTOR'S equipment and all other facilities, final project <br />clean-up, and for all other work for which payment is not otherwise provided for under <br />the contract. <br />The temporary works and construction plant may include, but not be limited to the following: <br />a. Workshops, offices, storage yards, and construction plant and equipment including <br />spare parts, fuels, and oil; <br />b. Sanitation facilities, communication facilities, and sprinkler trucks; <br />c. Contractor's electrical power system; and, <br />d. Other items such as water, compressed air, etc., not specifically listed but required for <br />the functioning of construction activities. <br />1.2 EXECUTION <br />Mobilization <br />Upon receipt of the Notice to Proceed, the CONTRACTOR shall furnish, mobilize, move in, and <br />install such temporary works, equipment and construction plant as are necessary for the <br />successful completion of the work. The CONTRACTOR shall also operate and maintain such <br />temporary works, equipment and construction plant throughout the period of construction. <br />All applicable temporary works, such as sanitation facilities, shall fully comply with all rules <br />and regulations. <br />Clearing and grubbing operations necessary for the temporary works, if any, shall also be <br />included as mobilization. <br />14
The URL can be used to link to this page
Your browser does not support the video tag.