My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-04-13_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-04-13_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:49:59 PM
Creation date
7/11/2008 2:20:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/13/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demobilization <br />Upon completion of the work under this Contract, the CONTRACTOR shall remove all <br />temporary works, equipment and construction plant. The CONTRACTOR shall remove from <br />the work site all rubbish, unused materials, and shall fill and dress all holes and cavities made <br />for convenience, and leave all areas in good order and condition, subject to the approval of <br />the PROJECT MANAGER. <br />1.3 MEASUREMENT AND PAYMENT <br />No measurement for payment shall be made for mobilization and demobilization. Payment of <br />two-thirds of the lump sum price bid will be made with the first monthly progress payment <br />after completion of the work described above for mobilization. Payment of one-third of the <br />lump-sum price bid will be made with the final progress payment for the work if demobilization <br />has been completed. If the price bid for mobilization and demobilization is greater than 15 <br />percent (15%) of the total contract price, invoices supporting the mobilization costs will be <br />required before payment is approved. <br />Remobilization <br />If remobilization becomes necessary due to seasonal conditions beyond the CONTRACTOR'S <br />control, remobilization costs will be paid based on documented actual costs. No <br />remobilization payment will be made if delays necessitating remobilization were the <br />CONTRACTOR'S responsibility. <br />15
The URL can be used to link to this page
Your browser does not support the video tag.