Laserfiche WebLink
Demobilization <br />This item shall include all labor, equipment, and costs associated with demobilization and <br />clean-up of the work site to its original or better condition. All equipment and supplies, <br />materials, and debris related to this project will be removed from the site upon completion. <br />The CONTRACTOR shall also reclaim any staging area or other ground disturbed during the <br />course of the project located outside of the project area as defined by this Bid Document. All <br />haul roads shall be fully regraded and reclaimed upon completion of the project. Additional <br />final grading shall be accomplished, if needed, to reduce steep slopes and contour on the <br />project site areas not specifically addressed in the work plan. See also 1.0 <br />Mobilization/Demobilization, attached. <br />Remobilization <br />See 1.0 Mobilization/Demobilization, attached. <br />Measurement and Payment <br />See 1.0 Mobilization/Demobilization, attached. <br />Task 2 - Linden Avenue Coal Loadout <br />The purpose of this task is to remove and dispose of coal, coal fines and other imported rock <br />from portions of a six-acre industrial site previously used as railroad coal load out. The work <br />will include grading, so that drainage is away from the A.T. & S.F. railroad tracks, and <br />revegetation of a portion of the site, near the Baca Ditch. <br />Work Description <br />The area containing coal to be removed comprises some four (4) acres, and extends <br />approximately 950 feet north of Linden Avenue, between the A.T. & S.F. Railroad tracks and <br />Baca irrigation ditch. Coal depth varies between 4 and 31 inches as shown by thickness <br />contours on Map #3. Coal and other imported rock will be removed to a depth sufficient to <br />obtain a 1 % grade away from the railroad tracks. Grading shall begin six (6) inches from the <br />ties at their bottom elevation. This will cause surface water to collect in a swale located west <br />of and paralleling the Baca ditch. Near the railroad tracks the bottom of the coal layer to be <br />removed is marked by the presence of red limestone ballast, otherwise natural soil is present. <br />Removed material is to be disposed of at the City of Trinidad landfill located on Indiana Street, <br />approximately 2 miles from the loadout, or the municipal power plant located on U.S. 160- <br />135, near the north city limit of Trinidad, one mile from the loadout. <br />The general location of a sewer manhole is shown on Map #3. The contractor is responsible <br />for locating all above and below surface utilities and protection of same from damage. The <br />Baca ditch is an active irrigation ditch and is not to be filled or otherwise interfered with. <br />Revegetation of the disturbed area will be limited to a 100 foot wide section paralleling the <br />Baca ditch. <br />Measurement and Payment <br />There will be no measurement for payment for Task #2. Payment for Task #2 will be <br />reflected in a lump sum bid under Item #2 on the Bid Schedule. <br />6