My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-04-13_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-04-13_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:49:59 PM
Creation date
7/11/2008 2:20:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/13/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT WORK DESCRIPTION <br />The following tasks will be performed on this Project: <br />Task #1: Mobilization and Demobilization <br />Task #2: Linden Avenue Loadout coal removal and reclamation <br />Task #3: Section 15 stream realignment <br />Task #4: Pond 15-PlO removal <br />Task #5: Reconstruction of Pond 22-Pl0 <br />Task #6: Ditch repair, culvert installation, rock swale construction <br />Task #7: Spillway repair and clean out of Pond 15-P20, and removal of associated ditch <br />Task #8: Spillway removal pond 22-P4 <br />Task #9: Ditch and gully repair <br />Task #10: Spillway repair ponds 15-P1 1 and 15-Pl2 <br />Task #11: Riser modification, Ponds 22-P5, 22-P6, and 22-PlO <br />Task #12: Trailer removal <br />Task #13: Revegetation <br />Task #14: Reforestation of areas near Ponds 15-P20 and 22-Pl7 <br />Task 1- Mobilization and Demobilization <br />The CONTRACTOR shall exercise caution during mobilization, performance of all work tasks, <br />and demobilization in order to avoid damage to public and private property including, but not <br />limited to, railroad tracks, pavements, soils, vegetation, water supplies, fences, walls, <br />structures, existing sediment Ponds, landscaping, etc. The CONTRACTOR shall repair and <br />restore public or private property damaged during the work at his expense. <br />The CONTRACTOR shall be fully responsible for any and all damage to property caused by his <br />equipment or personnel. The CONTRACTOR shall ensure that the job site is restored to <br />original or better condition and that the PROJECT MANAGER accept that the work is <br />complete. <br />Mobilization <br />This task includes moving equipment and supplies to the project area. If desired, the <br />CONTRACTOR may establish a staging area for the storage of all equipment and supplies. <br />The area shall be of adequate size to accommodate all of the CONTRACTOR'S vehicles, <br />equipment and supplies and shall be approved by the PROJECT MANAGER. The <br />CONTRACTOR shall minimize impact on the staging area with regard to noise, dust, and <br />fumes. The CONTRACTOR shall be responsible for maintaining security of the staging area. <br />This task also includes all labor and costs associated with locating and protecting utilities, <br />both above ground and underground, at the work site. Contamination of soil and surface or <br />ground water from petroleum products will not be permitted and must be taken into <br />consideration. <br />See also 1.0 Mobilization/Demobilization, attached. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.