My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-04-13_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-04-13_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 7:49:59 PM
Creation date
7/11/2008 2:20:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/13/1995
Doc Name
PKA-9-440
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br />A Notice of Award will be sent to the apparent low bidder within four (4) days of the bid <br />opening. The contract signing date and time will be set for fourteen (14) days after the bid <br />opening. The Division of Minerals and Geology must receive the following: <br />(a) Executed Agreement; <br />(b) Fully-executed Performance and Payment Bonds, accompanied by <br />appropriate Power of Attorney, effectively dated; <br />(c) Certificates of Insurance showing proof of required coverage and <br />Additional Insured Endorsement; <br />(d) Project schedule; <br />(e) AML Contractor Ownership and Control Form; <br />(f) Minority (MBEYwomen (WBE) Business Participation form; <br />(g) Three-Way Agreement for Reclamation Activities, if required by the <br />Special Conditions, and <br />(h) Completed W-9 forms, if required (for contractors new to the State). <br />Please consult Articles 2-7 of the General Conditions <br />If the above documents are not submitted properly by the contract signing date, the Division <br />of Minerals and Geology may elect to award the contract to the next lowest bidder. Bidders <br />are advised to keep close contact with DMG during this period. <br />THREE-WAY AGREEMENT <br />A three way "Agreement for Reclamation Activities" is not required for this job. Please see <br />Article 4 of the General Conditions for the applicable insurance requirements. <br />CONDITIONS AFFECTING THE WORK <br />In addition to examining the drawings and specifications, completion schedule, and other <br />instructions, bidders shall visit the site and take such other steps as may be reasonably <br />necessary to ascertain the nature and location of the work, including average climatic <br />conditions and the general and local conditions which can affect the work or the cost thereof. <br />Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty <br />or cost of successfully performing the work. <br />PROJECT FUNDING <br />This project is funded 100°x6 through monies made availabld to the State of Colorado through <br />revocation of bond monies retained by the Division of Minerals and Geology for <br />reclamation of this previously permitted mining operation. <br />AMERICANS WITH DISABILITIES ACT <br />All programs, services and activities of the Department of Natural Resources, Division of <br />Minerals and Geology and the Colorado mined Land Reclamation Board are operated in <br />compliance with the Americans with Disabilities Act. Questions, complaints and requests for <br />additional information may be directed to ADA Coordinator, Department of Natural Resources, <br />1313 Sherman Street, Room 718, Denver, CO 80203. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.