My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_PERMIT FILE - C1982056A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-02-04_PERMIT FILE - C1982056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
6/5/2008 2:16:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/4/2008
Section_Exhibit Name
2.04 Environmental Resources
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water handling and treatment facilities are shown on Map 24, Surface Facilities, Fish Creek Borehole/Shaft Area <br />Facilities and Access Road. Ground water inflow to the mine will be pumped from the underground workings to <br />sumps, then from the sumps to the surface through boreholes. The water will be treated to meet effluent limitations <br />on water quality such that downstream water rights will be impaired. <br />The only water right that is likely to be affected is that of the Colorado Yampa Coal Company Area 2 Pit, <br />adjudicated for 20 acre-feet per year absolute, 480 acre-feet per year conditional. Consequently, mitigation of <br />impact to private water rights resulting from underground mining operations should not be necessary. In the <br />unlikely event mining operations are proven to impact private water users, the flow rights mentioned above are <br />available for augmentation of such water sources. The Homestead Ditch can serve as a source of irrigation water <br />for downstream users of water, which has been, contaminated to the extent it no longer serves its intended purpose. <br />Also, a contractor such as Ed's Excavating can be utilized to haul water from Steamboat Springs to the affected <br />Pm'4'~ <br />9 & 10 Right Gateroad Extension <br />TCC is not anticipating any impacts to the wells listed in Exhibit 6B or shown on Map I to from mining the 9 and <br />10 Right gateroads. The reason for this opinion is that all the wells are relatively shallow and separated from the <br />mine workings by the Marine Shale. This unit effectively acts as an aquiclude between the mine and overlying <br />sandstone units. Any inflows into the main, which might occur from the mining of the gateroads, would be from <br />the Wadge Overburden, which includes the Wadge Coal. None of the wells listed in Exhibit 6B are completed in <br />this unit. <br />In the unlikely and unanticipated event that anear-surface well was ever impacted by the mining operation, there <br />are alternative water supplies that could be used for augmentation. The sources of water include: 1) hauling water <br />from Steamboat Springs, 2) drilling a new well, 3) repairing the existing well. The first option would be utilized <br />until either the existing well was repaired or replaced. <br />EASTERN MINING DISTRICT <br />Table 12, Eastern Mining District Summary of Surface Water Rights, has been updated to include two irrigation <br />ditches adjacent to the Life of the Mine Permit area. These ditches are located in section 36, T6N, R86W. The <br />ongoing monitoring work conducted by Twentymile Coal Company and Colorado Yampa Coal Company (refer to <br />Permit C-81-071) indicates there are no impacts of the permit boundary. Twentymile is not predicting any <br />additional impacts to the quality or quantity of water in Trout Creek. <br />The only adjudicated water supply system that could be impacted by mining in the Eastern Mining District is that <br />owned by the Ashley's. In the event this occurred, Twentymile would have water hauled to them from Steamboat <br />Springs until a permanent system could be reestablished. Twentymile understands that it would be responsible for <br />replacing their current system if it is damaged. <br />In the event that TCC's mining activities caused a loss of water from the surface streams so that senior downstream <br />users placed a call on the system, the mine has adequate water rights to mitigate this loss. If this occurred during <br />the irrigation season, Cyprus could stop flow through any of its headgates and allow the water to move <br />downstream. If additional water were required, TCC could have water discharged from any of the large permanent <br />impoundments that surround the mine. Also during this time, TCC would continue to discharge from the mine, <br />which would be adding water to the system. I Please refer to Table 9, Summary of Ground Water Rights, and <br />Table 12, Summary of Surface Water Rights, fora listing of the water rights controlled by Cyprus. <br />u <br />APPRG~I~D APR ~ 4 2000 <br />Permit Renewal No. 3 2.04-39 4/1/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.