My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_PERMIT FILE - C1992081A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-03-13_PERMIT FILE - C1992081A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:58 PM
Creation date
6/4/2008 5:29:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
3/13/2008
Doc Name
Railcar Loadout Operations Plan Reclamation Liability Estimate
Section_Exhibit Name
Tab 23 Attachment 23-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hayden Gulch Loadout <br />Facility Demolition -Existing and On-the-Ground Buildings <br />(Coal Loadout Operations) <br /> <br />Prepared 11/7/07 <br />Buildings and Dimensions presented in Table 12-1.2 <br />Unit Costs are based on CDMG Liability Calculation prepared 6/10!05 as part of TR-06 <br /> <br />Description Dimensions Reference Quantity Unit Cost Total Cost <br /> <br />Truck Dump Hopper 6,600 CDMG 6,600 CF $0.787 $5,194.20 <br />Floor - 18" 495 CDMG 495 SF $6.08 $3,009.60 <br />Foundation Walls - 30" 7963 CDMG' 7963 LF $6.50 $51,759.50 <br /> <br />Reclaim Tunnel 36" Belt Vibrator 12 CDMG' 12 LF $13.95 $167.40 <br /> <br />Dump Hopper Conveyor Tunnel - 10' Diameter 115 CDMG' 115 LF $214.37 $24,652.55 <br />Belt Conveyor 147 CDMG 147 LF $20.93 $3,076.71 <br /> <br />Crusher Building 20160 CDMG' 20160 CF $0.787 $15,865.92 <br />Floor - 12" 672 CDMG 672 SF $3.04 $2,042.88 <br />Crusher and bag house 2511 CDMG' 2511 CF $0.787 $1,976.16 <br />Crusher Belt Conveyor 210 CDMG' 210 LF $20.93 $4,395.30 <br /> <br />Conical stack tube 520 CDMG 520 SF $13.95 $7,254.00 <br />Stacker Reclaim Tunnel <br />Reclaim Tunnel 60" Belt Vibrator 53.5 CDMG' 53.5 LF $41.83 $2,23 <br />Floor- 12" 3014 CDMG 3014 SF $3.04 $9,162. <br />Foundation Walls - 12" 3600 CDMG 3600 LF $3.04 $10,944.00 <br />Loadout Belt - 60" 290 CDMG' 290 LF $41.83 $12,130.70 <br />Reclaim Conveyor Tunnel - 10' diameter 79 CDMG' 79 LF $214.37 $16,935.23 <br /> <br />Loadout Building 63700 CDMG' 63700 CF $0.787 $50,131.90 <br />Footing 130 CDMG 130 LF $18.22 $2,368.60 <br /> <br />Powerhouse (2) 2,240 CDMG 2240 CF $0.7870 $1,762.88 <br />Floor 224 CDMG 224 SF $2.02 $452.48 <br /> <br />Dust Suppression Pressure Tank Building 1344 CDMG 1344 CF $0.787 $1,057.73 <br />Floor - 8" 192 CDMG 192 SF $2.02 $387.84 <br /> <br />Dust Suppression System Building 672 CDMG' 672 CF $0.787 $528.86 <br />Floor - 8" 96 CDMG' 96 SF $2.02 $193.92 <br /> <br />Water Storage Tank 6872 CDMG' 6872 CF $0.787 $5,408.26 <br /> <br />Railroad Trank (Loop and Spur) 17424 CDMG 17424 LF $6.76 $117,786.24 <br />Ballast 1266 CDMG' 1266 CY $3.13 $3,962.58 <br /> <br />Office/Change House Trailer (existing) 1900 CDMG 1900 CF $0.787 $1,495.30 <br />Temporary Office Building (approved w/MR-15) 7200 Means2 7200 CF $0.13 $93 <br />Concrete sidewalk - 6" 300 Means2 300 SF $1.49 $4 <br />MR-16 23-2.4 Revised 11/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.